1. Section 51 advice
  2. Advice in detail

Advice to Norwich Cycling Campaign

Back to list

Enquiry

From
Norwich Cycling Campaign
Date advice given
8 February 2021
Enquiry type
Email

I prepared a submission to Highways England on behalf of Norwich Cycling Campaign on the dualling of the A47 Blofield to North Burlingham. Due to various personal matters I have been unable to follow this up. Since I prepared this submission the Government has published two important policy documents: "Gear Change" "Cycle Infrastructure Design LTN 1/20" "Gear Change" announced a new regulatory body which will have extensive powers with regard to the provision and design of cycling and walking facilities. Reading these documents, and the relevant sections of the latest edition of the Design Manual for Road and Bridges, it appears that the plans or the A47 published by Highways England fall short of the policies set out in the above documents. I am not sure of the exact statues of the Inquiry process at the moment. I am therefore seeking advice as to what Norwich Cycling Campaign should do to make sure we have an opportunity to raise these matters.

Advice given

The A47 Blofield to North Burlingham application was accepted for Examination on 27 January 2021. The Applicant is now required to serve notice that the application has been formally accepted, under s56 of the Planning Act 2008. This notice, amongst other things, must include details of how members of the public can register to become ‘Interested Parties’ (IP) and submit a ‘Relevant Representation’ (RR) setting out the matters the appointed ‘Examining Authority’ (the inspector or panel of inspectors who will examine the application) should consider in its Examination of the application. The Inspectorate will publicise the notice and associated information on the project page of the National Infrastructure Planning website once the RR period has started. You may wish to register to receive key information: https://infrastructure.planninginspectorate.gov.uk/email-subscription.php?project=TR010040&email= Once the RR period formally opens, you can register to become an IP and submit a RR setting out your concerns, such as whether the Proposed Development should have regard to the recently published non-motorised user policies set out in your email. You can also expand and provide further evidence via ‘Written Representations’ and/ or oral submissions at hearings once the Examination formally commences and a timetable setting out the associated deadlines and hearings is agreed and published. You may find the following Inspectorate advice notes helpful: https://infrastructure.planninginspectorate.gov.uk/wp-content/uploads/2013/04/Advice-note-8-2v3.pdf https://infrastructure.planninginspectorate.gov.uk/wp-content/uploads/2014/06/Advice-note-8-3v4.pdf https://infrastructure.planninginspectorate.gov.uk/wp-content/uploads/2013/04/Advice-note-8-4v3.pdf https://infrastructure.planninginspectorate.gov.uk/wp-content/uploads/2013/04/Advice-note-8-5v3.pdf