Back to list A12 Chelmsford to A120 Widening Scheme

Representation by Malcolm Campbell

Date submitted
27 October 2022
Submitted by
Members of the public/businesses

this is about th land north of perrywood garden centre kevedon road inwoth essex 1. this field has a high pressure gas main running through it and i have not seen support from CADENT that the proposed works would be acceptable with them or if this main is diverted 2. the cause of local flooding in the area is from the collapsed culvert and if this were to be fixed then i do not feel there is a reason to provide the flood mitigation 3.i do not object to the whole scheme but just the localised design along the B1023