Cyngor i Jonathan Fowler

Yn ôl i'r rhestr

Ymholiad

Oddiwrth
Jonathan Fowler
Y dyddiad y rhoddwyd y cyngor
15 Mai 2018
Math o ymholiad
Email

Can the Planning Inspectorate please advise the number of applications to date which have been withdrawn by the applicant, along with the name or other reference for such withdrawn applications. An indication of the total number of DCO applications and preapplications to date would also be welcome.

Cyngor a roddwyd

Five applications have been withdrawn during the Acceptance stage:

• Rampion Offshore Wind Farm: https://infrastructure.planninginspectorate.gov.uk/projects/south-east/rampion-offshore-wind-farm/
• Mynydd y Gwynt Wind Farm: https://infrastructure.planninginspectorate.gov.uk/projects/wales/mynydd-y-gwynt-wind-farm/ • York Potash Harbour Facility: https://infrastructure.planninginspectorate.gov.uk/projects/north-east/york-potash-harbour-facilities-order/ • Tees CCPP: https://infrastructure.planninginspectorate.gov.uk/projects/north-east/tees-ccpp/?ipcsection=overview • Manston Airport: https://infrastructure.planninginspectorate.gov.uk/projects/south-east/manston-airport/

Five applications have been withdrawn after they were accepted for examination:

• Electric line connection to Maesgwyn Wind Farm • Brig y Cwym Energy from Waste Generating Station • Roosecote (Barrow) Biomass Power Station • Fieldes Lock – Rail linked power station • Atlantic Array Offshore Wind Farm

The project pages for these five applications have been removed from the website. For further information see the following: https://infrastructure.planninginspectorate.gov.uk/help/about/

There are 147 applications that are either at the Pre-application, Acceptance, Pre-examination, Examination or Recommendation and Decision stages, or have been decided: https://infrastructure.planninginspectorate.gov.uk/projects/

A list of the applications that are at the Acceptance stage or have previously been accepted for examination is available here: https://infrastructure.planninginspectorate.gov.uk/projects/register-of-applications/