View examination library (PDF, 685KB) containing document reference numbers
-
4.2 Works Plans
(PDF, 2MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 16.8 - Instantaneous excess SSC (top) and sedimentation (bottom) following discrete disposal events
(PDF, 421KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 17.1 - Water Framework Directive (WFD) water bodies
(PDF, 6MB)
From Associated British Ports
-
7.1 Planning Statement Appendices - Appendix C – Project Accordance with the North East Lincolnshire Local Plan
(PDF, 345KB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 14.H: Report on Geophysical Survey
(PDF, 2MB)
From Associated British Ports
-
6.6 Outline Decommissioning Environmental Management Plan
(PDF, 410KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 16.10 - Timeseries of predicted change to current speed, direction and bed shear stress for points P1, P2, P3 and P4
(PDF, 577KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure - 16.3 - Current and wave rose for the site from the Project survey data
(PDF, 429KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 21.3 - Groundwater Features
(PDF, 2MB)
From Associated British Ports
-
6-3 Environmental Statement Figures Figure 13.9.1 to 13.9.13
(PDF, 10MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 2.C: Hydrogen Production Process
(PDF, 182KB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 21.C: Outline Remediation Strategy
(PDF, 321KB)
From Associated British Ports
-
7.10 Sampling Plan
(PDF, 1MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 13.3 - Zone of Theoretical Visibility - Visual Screening
(PDF, 3MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 13.A: Landscape and Visual Assessment Methodology
(PDF, 333KB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 2.A: Waste Hierarchy Assessment
(PDF, 379KB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 1.A: Scoping Report
(PDF, 40MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 16.B: Geophysical Survey Report
(PDF, 9MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 10.2 - Humber Estuary Nature Conservation Designations
(PDF, 8MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 9.2 - Internationally and Nationally Designated Conservation Sites
(PDF, 5MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 1.E: Abbreviations and Glossary
(PDF, 684KB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 12.B: Navigational Simulation Survey
(PDF, 43MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 10.1 - Monitoring locations of coastal water-bird surveys in the vicinity of the Project
(PDF, 4MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 11.4 - Traffic Accident Locations
(PDF, 2MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 18.5 - WFD Baseline Screening Sampling Locations
(PDF, 2MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 2.2 - Site Boundary and Administrative Context
(PDF, 1MB)
From Associated British Ports
-
6.9 Outline Landscape and Ecology Management Plan
(PDF, 2MB)
From Associated British Ports
-
6.2 Environmental Statement - Chapter 3: Need and Alternatives
(PDF, 931KB)
From Associated British Ports
-
7.4 Consents and Agreements Position Statement
(PDF, 331KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 21.2 - Bedrock Geology
(PDF, 2MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 9.4 - TrAC fish monitoring stations in the vicinity of the Project
(PDF, 7MB)
From Associated British Ports
-
6.2 Environmental Statement - Chapter 18: Water Use, Water Quality, Coastal Protection, Flood Risk and Drainage
(PDF, 2MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 18.B: Drainage Strategy
(PDF, 13MB)
From Associated British Ports
-
6.5 Outline Construction Environmental Management
(PDF, 4MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 6.3A1 - Operational Phase Air Quality Assessment Concentrations and Deposition Rates (MARPOL Tier III)
(PDF, 6MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 9.7 - Harbour porpoise sightings in the Humber Estuary since 2000
(PDF, 5MB)
From Associated British Ports
-
7.1 Planning Statement Appendices - Appendix D – Planning History and Land Use Designations
(PDF, 2MB)
From Associated British Ports
-
7.9 Sediment Contamination Data (Part 1)
(PDF, 106KB)
From Associated British Ports
-
Adequacy of Consultation Representation
(PDF, 580KB)
From Lincolnshire County Council
-
Adequacy of Consultation Representation
(PDF, 174KB)
From North East Lincolnshire Council
-
6.3 Environmental Statement - Figure 25.2 - Cumulative Assessment Short List
(PDF, 4MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 6.1 - Air Quality Study Area
(PDF, 21MB)
From Associated British Ports
-
6.7 Outline Construction Traffic Management Plan
(PDF, 2MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 23.1 - Socio-Economic Receptors within the Site Boundary
(PDF, 951KB)
From Associated British Ports
-
6.2 Environmental Statement - Chapter 17: Marine Water and Sediment Quality
(PDF, 1MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 12.2 - Detailed View (Port of Immingham)
(PDF, 747KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 14.2 - Non-Designated Heritage Assets
(PDF, 2MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 1.D: Statement of Competence
(PDF, 264KB)
From Associated British Ports
-
6.2 Environmental Statement - Chapter 25: Cumulative and In-Combination Effects
(PDF, 736KB)
From Associated British Ports
-
7.1 Planning Statement Appendices - Appendix E – Government Policy Documents that Support the Transition to Net Zero
(PDF, 250KB)
From Associated British Ports
-
4.7 Stopping Up and Restriction of Use of Streets and Public Rights of Way Plan
(PDF, 2MB)
From Associated British Ports
-
Adequacy of Consultation Representation
(PDF, 146KB)
From Hull City Council
-
6.3 Environmental Statement - Figure 23.4 - Lower Super Output Areas - North East Lincolnshire 001A & North East Lincolnshire 007A
(PDF, 2MB)
From Associated British Ports
-
3.3 Funding Statement
(PDF, 23MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 10.3 - The 5-year mean peak number of birds in Sector C during different months
(PDF, 7MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 2.6 - Indicative Project Phasing Plan
(PDF, 2MB)
From Associated British Ports
-
6.2 Environmental Statement - Chapter 7: Noise and Vibration
(PDF, 1MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 7.B: Construction Sound Data and Assumptions
(PDF, 222KB)
From Associated British Ports
-
6.2 Environmental Statement - Chapter 15: Historical Environment (Marine)
(PDF, 664KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 21.6 - Source Protection Zones
(PDF, 2MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 8.C: Bat Survey Report
(PDF, 3MB)
From Associated British Ports
-
6.2 Environmental Statement - Chapter 2: The Project
(PDF, 2MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure - 16.4 - Particle Size Distribution (PSD) across Project site and disposal grounds
(PDF, 980KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 18.1 -Site Location Plan
(PDF, 2MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 25.C: Assessment of Cumulative Effects
(PDF, 1MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 7.C: Operational Noise Modelling Information
(PDF, 292KB)
From Associated British Ports
-
4.1 Location Plan
(PDF, 1MB)
From Associated British Ports
-
4.3 Illustrative Layouts
(PDF, 3MB)
From Associated British Ports
-
4.5 Land Plans
(PDF, 2MB)
From Associated British Ports
-
Adequacy of Consultation Representation
(PDF, 85KB)
From East Lindsey District Council
-
Section 51 advice to the Applicant
(PDF, 167KB)
-
Adequacy of Consultation Representation
(PDF, 339KB)
From North Lincolnshire Council
-
Section 55 Checklist
(PDF, 408KB)
-
4.4 Illustrative Sections and Elevations
(PDF, 2MB)
From Associated British Ports
-
Adequacy of Consultation Representation
(PDF, 79KB)
From West Lindsey District Council
-
Notification of Decision to Accept Application
(PDF, 141KB)
-
6.4 Environmental Statement Appendices - Appendix 14.C: Archaeology and Cultural Heritage Desk-based Assessment
(PDF, 7MB)
From Associated British Ports
-
Regulation 32 - Transboundary Screening
(PDF, 135KB)
-
S46 Notification
(PDF, 815KB)
-
Acknowledgement of S46 Notification for Second Statutory Consultation
(PDF, 149KB)
-
Regulation 32 notification response - Denmark
(PDF, 96KB)
-
Acknowledgement of S46 Notification
(PDF, 167KB)
-
S46 Notification
(PDF, 818KB)
-
Late scoping consultation response
(PDF, 161KB)
From Anglian Water
-
Late scoping consultation response
(PDF, 198KB)
From North East Lincolnshire Council
-
Adopted by the Secretary of State on 10 October 2022
(PDF, 3MB)
From Scoping Opinion
-
Late scoping consultation response
(PDF, 90KB)
From East Lindsey District Council
-
Scoping Report submitted to the Secretary of State on 30 August 2022
(PDF, 40MB)
From Associated British Ports