View examination library (PDF, 849KB) containing document reference numbers
-
6.4 Environmental Statement Appendices - Appendix 14.E: Written Scheme of Investigation for GI Watching Brief, Geoarchaeological Boreholes, Geophysical Survey and Archaeological Trial Trenching
(PDF, 10MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 15.B: Outline Marine Archaeological Written Scheme of Investigation
(PDF, 675KB)
From Associated British Ports
-
7.1 Planning Statement Appendices - Appendix G – Design Evolution
(PDF, 2MB)
From Associated British Ports
-
7.7 Utilities Statement
(PDF, 9MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 16.15 - Predicted change to 0.5-yr Hs from northeast (top) and east (bottom)
(PDF, 535KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure - 16.6 - Maximum excess SSC (top) and sedimentation (bottom) resulting form the full proposed capital dredge works
(PDF, 616KB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 15.A: Marine Archaeology Technical Report
(PDF, 926KB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 16.C: AWAC Deployment: Hydrodynamic Study
(PDF, 7MB)
From Associated British Ports
-
1.1 Application Form Signed
(PDF, 2MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 2.1 - Site and Surrounding Environment Key Plan
(PDF, 28MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 11.A: Traffic Collision Data
(PDF, 337KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 11.5 - HGV Routeing to Site
(PDF, 2MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 1.B: Scoping Opinion
(PDF, 3MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 14.D: Heritage Standards and Guidance
(PDF, 210KB)
From Associated British Ports
-
5.2 Consultation Report - Appendix I - Section 46 Notification - First Statutory Consultation
(PDF, 335KB)
From Associated British Ports
-
5.2 Consultation Report - Appendix L - Section 46 Notification - Second Statutory Consultation
(PDF, 350KB)
From Associated British Ports
-
5.2 Consultation Report - Appendix A - First Statement of Community Consultation
(PDF, 2MB)
From Associated British Ports
-
5.2 Consultation Report - Appendix G
(PDF, 16MB)
From Associated British Ports
-
5.2 Consultation Report - Appendix O - EIA Regulation Notification Consultation
(PDF, 530KB)
From Associated British Ports
-
5.2 Consultation Report - Appendix H - First Statutory Consultation - Part 2
(PDF, 32MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 13.2 - Zone of Theoretical Visibility - Bare Earth
(PDF, 3MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 12.A: Navigational Risk Assessment
(PDF, 6MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 14.G: Report on Geoarchaeological Survey and monitoring of Geotechnical Investigations
(PDF, 9MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 13.6 - Designations
(PDF, 2MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 21.8 - Previous Ground Investigations
(PDF, 496KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 23.3 - Socio-Economic Receptors within 5km of the Site Boundary (Primary Healthcare)
(PDF, 2MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 6.A: Construction Dust Assessment Method
(PDF, 305KB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 8.D: Otter and Water vole Survey Report
(PDF, 3MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 16.12 - Timeseries of predicted change to current speed, direction and bed shear stress for points P6, P10, P11 and P12
(PDF, 542KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 18.4 - Water Framework Directive Waterbodies within the Zone of Influence
(PDF, 2MB)
From Associated British Ports
-
6.2 Environmental Statement - Chapter 22: Major Accidents and Disasters
(PDF, 1MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 1.1 - Site Location Plan
(PDF, 2MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 10.6 - Potential disturbance buffer applied to the approach jetty
(PDF, 1MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 25.B: Cumulative Effects Assessment Short List
(PDF, 309KB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 6.B: Dispersion Modelling Assessment Method
(PDF, 680KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 17.3 - Water sampling location
(PDF, 2MB)
From Associated British Ports
-
7.8 Equality Impact Assessment
(PDF, 2MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 21.5 - East Site Constraints Plan
(PDF, 615KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 23.2 - Socio-Economic Receptors within 500m of the Site Boundary
(PDF, 1MB)
From Associated British Ports
-
6.2 Environmental Statement - Chapter 8: Nature Conservation (Terrestrial Ecology)
(PDF, 782KB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 10.A: Baseline Ornithology Data
(PDF, 4MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 19.B: Climate Change Resilience (CCR) Assessment
(PDF, 252KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 16.17 - Predicted change to 50-yr Hs for 50-yr wave event from east (top) and southeast (bottom)
(PDF, 542KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure - 16.5 - Project scheme elements
(PDF, 219KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 11.2 - Local Highway Network Plan
(PDF, 2MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 6.3B2 - Operational Phase Air Quality Assessment Impacts (MARPOL Tier II)
(PDF, 6MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 9.1 - Project subtidal benthic sampling stations
(PDF, 731KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 9.6 - Aerial counts of grey seals at Donna Nook
(PDF, 10MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 2.7 - Indicative Area of Capital Dredge
(PDF, 984KB)
From Associated British Ports
-
3.2 Statement of Reasons
(PDF, 696KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure - 16.2 - Bathymetric data across project site
(PDF, 4MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 18.2 - Environment Agency Flood Map for Planning
(PDF, 2MB)
From Associated British Ports
-
7.1 Planning Statement Appendices - Appendix B – Project Accordance with the East Inshore Marine Plan
(PDF, 332KB)
From Associated British Ports
-
7.1 Planning Statement Appendices - Appendix F – Harbour Improvement Statement Planning
(PDF, 252KB)
From Associated British Ports
-
4.11 Historic Environment Plans
(PDF, 230KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 15.3 - Palaeogeographic feature data example – 7502
(PDF, 324KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 16.14 - Predicted difference (to baseline) in bed thickness change over a mean spring neap cycle
(PDF, 400KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure - 16.7 - Excess SSC (top) and sedimentation (bottom) at locations up- (left) and down-estuary (right); tide for context
(PDF, 684KB)
From Associated British Ports
-
6.2 Environmental Statement - Chapter 14: Historical Environment (Terrestrial)
(PDF, 717KB)
From Associated British Ports
-
6.2 Environmental Statement - Chapter 23: Socio-economics
(PDF, 720KB)
From Associated British Ports
-
3.1 Book of Reference
(PDF, 2MB)
From Associated British Ports
-
6-3 Environmental Statement Figures Figure 13.8.1 to 13.8.13
(PDF, 14MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 15.5 - Data examples of seabed features
(PDF, 2MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 15.4 - Seabed features of archaeological potential
(PDF, 671KB)
From Associated British Ports
-
6.2 Environmental Statement - Chapter 6: Air Quality
(PDF, 1MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 11.B: Traffic and Transport Cumulative Effects Assessment
(PDF, 438KB)
From Associated British Ports
-
6.2 Environmental Statement - Chapter 1: Introduction
(PDF, 351KB)
From Associated British Ports
-
7.9 Sediment Contamination Data (Part 2)
(PDF, 96KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 16.11 - Timeseries of predicted change to current speed, direction and bed shear stress for points P5, P7, P8 and P9
(PDF, 572KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 2.4 - Site Boundary Changes between EIA Scoping Report (August 2022) and the Application (September 2023) Key Plan
(PDF, 6MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 3.1 - Water Depths of 7m Below Chart Datum
(PDF, 2MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 13.1 - Project Location and Study Area
(PDF, 2MB)
From Associated British Ports
-
2.1 Draft Development Consent Order
(PDF, 794KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 16.1 - Regional setting within wider Humber
(PDF, 2MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 16.16 - Predicted change to 0.5-yr Hs from southeast (top) and to 50-year Hs from northeast (bottom)
(PDF, 539KB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 16.A: Numerical Model Calibration
(PDF, 4MB)
From Associated British Ports
-
6.2 Environmental Statement - Chapter 10: Ornithology
(PDF, 2MB)
From Associated British Ports
-
7.5 Statutory Nuisances Statement
(PDF, 359KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 10.4 - The broad distribution of coastal water-birds in Sector C
(PDF, 4MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 17.2 - Water Framework Directive (WFD) protected areas
(PDF, 5MB)
From Associated British Ports
-
7.1 Planning Statement
(PDF, 5MB)
From Associated British Ports
-
4.8 Traffic Regulations Measures Plan
(PDF, 2MB)
From Associated British Ports
-
4.9 Plan of Potentially Affected Hedgerows and Trees Subject to Preservation Orders
(PDF, 1MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 12.3 - AIS Data Tracks by Type (May 2022)
(PDF, 1MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 13.4 - Landscape Character Areas - National Regional
(PDF, 2MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 23.5 - North East Lincolnshire Local Authority Area
(PDF, 2MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 25.1 - Cumulative Assessment Long List
(PDF, 2MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 21.B: Phase II Ground Investigation Interpretative Report
(PDF, 40MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 21.1 - Superficial Geology and Artificial Ground
(PDF, 2MB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 9.5 - Annual grey seal pup counts at Donna Nook
(PDF, 10MB)
From Associated British Ports
-
6.2 Environmental Statement - Chapter 12: Marine Transport and Navigation
(PDF, 1MB)
From Associated British Ports
-
1.4 Cover Letter and Section 55 Checklist
(PDF, 536KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 14.1 - Location of Designated Assets
(PDF, 2MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 2.B: Lighting Strategy
(PDF, 10MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 9.A: Benthic Survey Report
(PDF, 755KB)
From Associated British Ports
-
6.3 Environmental Statement - Figure 10.5 - Predicted noise levels during marine piling
(PDF, 3MB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 9.B: Underwater Noise Assessment
(PDF, 759KB)
From Associated British Ports
-
6.2 Environmental Statement - Chapter 20: Materials and Waste
(PDF, 996KB)
From Associated British Ports
-
2.2 Explanatory Memorandum
(PDF, 455KB)
From Associated British Ports
-
6.4 Environmental Statement Appendices - Appendix 8.B: Preliminary Ecological Appraisal Report
(PDF, 18MB)
From Associated British Ports