Project information
About the project
Type of application: Rail Freight Interchanges
Name of applicant: Ashfield Land Management Limited and Gazeley GLP Northampton s.á.r.l.
The proposed development comprises the following principal elements: • Demolition of existing buildings and structures; • An intermodal freight terminal with direct connections to the Northampton Loop Line, capable of accommodating trains of up to 775m long, including up to 3 gantry cranes, container storage, a train maintenance depot and facilities to transfer containers to Heavy Goods Vehicles (HGV); • An express freight terminal with direct connections to the West Coast Main Line, capable of accommodating trains of up to 240m long, a freight platform with associated loading and unloading facilities; • Up to 702, 097 sq m (GEA) of rail connected and rail served warehousing and ancillary service buildings including a lorry park, terminal control building and bus terminal; • New road infrastructure including a new separated access point on the A43 (T), an internal site underpass (under Northampton Road); • Strategic landscaping and open space including alterations to public rights of way, the creation of new ecological enhancement areas and publicly accessible open areas, flood attenuation, and the partial diversion of the Milton Malsor brook. • A comprehensive package of highways mitigation, including improvements to J15a of the M1.
Project stage
This project has been withdrawn.
You will be able to view any documents and information until the project is archived.
Project location
Land at Arm Farm, Milton Malsor, Northampton
Get updates
Enter your email address to receive:
- updates on project progress
- information on how to have your say
- notifications when key documents are published
Contact us
Telephone
If you have an interested party number, have it with you when you call.
Telephone: 0303 444 5000
Open Monday to Friday: 9am to 4pm.
Closed on weekends and bank holidays.
RailCentral@planninginspectorate.gov.uk.
When writing an email, quote the name of the project in the subject line.
We aim to respond within 10 working days.
Alternative formats
Call or email to ask for project documents in alternative formats such as PDF, large print, easy read, audio recording or braille.