Back to list Hinckley National Rail Freight Interchange

Representation by Jonathan Paul musson

Date submitted
14 May 2023
Submitted by
Members of the public/businesses

With the local area already loosing so much of its green space I don't think we can afford to loose more of it. The road system in the local area is already carnage with somedays it taking over 45 mins to travel the 4 miles from Burbage to Hinckley, how can we possibly build large projects like this without the added infrastructure ie. Opening more junctions of m69 / by pass of A5 from m69 into Nuneaton. These things need to be done first, then we need to look at how we replenish the green space and habitat loss elsewhere within the borough!