Initial plans again seem to be poorly thought out with lack of consideration of traffic increase and road capacity. Previously the plans referenced various ‘data’ as parts of studies done etc to suppose the need for the project and the validity of what was being proposed however this data was never shared and references to it was very vague. This needs to be clearly detailed to prove that the proposed construction has been properly thought out with the impact to the infrastructure etc properly analysed. Nobody that lives anywhere near this wants it and it’s frustrating that plans keep getting proposed with have numerous and obvious flaws which will have a severe impact on people’s day to day lives.