The list below includes a record of advice we have provided for this project.
-
Meeting regarding proposed non-material change application
-
Advice sought on draft application documents for an application to make a non material change to the DCO
-
Advice sought about making an application to make changes to the DCO
-
Objecting to the use of King Edward Memorial Park during the construction of the Thames Tideway Tunnel
-
Clarification on which matters in relation to sections 131 and 132 the Examining Authority are anticipating examining at the hearing on 17 January 2014
-
Advice sought regarding the publicity requirements associated with the need to advertsie an additional open floor hearing session in Deptford Lounge on 5th February 2014.
-
Thames Water Utilities Limited sent a lettter by email to the Planning Inspectorate on 24 December 2013, asking about their interpretation of the Examining authority?s second written questions issued ...
Read more
-
As the ExA is aware, the PLA has specific concerns about a number of sites along the river. This means that its interests in compulsory acquisition in relation to these sites will form elements of ma...
Read more
-
Please see attached links for enquiry and response between David Gawthorpe and The Planning Inspectorate.
-
Please see attached correspondence between Southwark London Borough Council and The Planning Inspectorate regarding the responses to the Examining Authority's first written questions.
-
To view the enquiry in its entirety please see attachment-
131108_WW010001_Holbeche SYR concerns about timing of hearings in relation to hearings.pdf
-
Concern about the short preparation time between publication of written representations and hearings.
See attached letter
-
I am writing on behalf of the Battersea Land owning companies (BPS). We on behalf of BPS are in discussions with the Thames Water team in connection with the proposed temporary use of land owned by B...
Read more
-
Panel Questions 4.19 to 4.23 deal with the Replacement Land Report which was submitted with the application as a piece of preliminary work, pending the passing and coming into force of the Growth and ...
Read more
-
Further to the discussion at the Preliminary Meeting, Thames Water submitted sample noise contour plans (attached) for advice as to whether, in this form, the material was likely to be useful to the E...
Read more
-
Will representatives from London Boroughs be able to accompany the Panel of Examining Inspectors on accompanied site visits and is there any guidance about this?
-
Royal Borough of Kensington and Chelsea (RBKC) enquired whether they were required to make a relevant representation; what the role of Local Impact Reports (LIR), Written Representations (WR) and Stat...
Read more
-
A representative of the ?Save Your Riverside? organisation telephoned the Inspectorate to ask what the likely timetable for the early stages of the process would be if the application for the Thames T...
Read more
-
Dear Sirs,
I wish to formally register my interest in this application and to make submissions to the inspectorate.
I have found the website relatively impenetrable and wish to ask if there is a ...
Read more
-
Please see correspondence from Councillor Nicholas Botterill attached
-
Dear sir/madam
I would like to send in a comment/make a representation about the Supersewer plans that will be submitted by Thames Water on 28th Feb 2013.
Is this the correct postal address to se...
Read more
-
To discuss the progress of the Thames Tideway Tunnel Project ahead of anticipated submission of the application.
-
Advice sought on draft Funding Statement
-
Planning Inspectorate meeting
with the Thames Tideway Tunnel
Forum
-
A meeting to discuss project progress in anticipation of submission.