Thames Tideway Tunnel

Section 51 advice

The list below includes a record of advice we have provided for this project.

There is a statutory duty, under section 51 of the Planning Act 2008, around an application or potential application. This includes recording the name of the person who requested advice and the advice given. This information has to be made publicly available.

Search advice

Search by key words or the name of person the advice was given to.

Showing 1 to 59 of 59 documents, newest first.

Results per page View 25 results per page | View 50 results per page | 100

  • View meeting with Tideway London

    Meeting regarding proposed non-material change application

  • View advice to Thames Water Utilities Lyd

    Advice sought on draft application documents for an application to make a non material change to the DCO

  • View meeting with Thames Water Utilities Ltd

    Advice sought about making an application to make changes to the DCO

  • View advice to Herra Mindful Smile

    Objecting to the use of King Edward Memorial Park during the construction of the Thames Tideway Tunnel

  • View advice to Thames Water Utilities Ltd

    Clarification on which matters in relation to sections 131 and 132 the Examining Authority are anticipating examining at the hearing on 17 January 2014

  • View advice to Thames Water Utilities Ltd

    Advice sought regarding the publicity requirements associated with the need to advertsie an additional open floor hearing session in Deptford Lounge on 5th February 2014.

  • View advice to Thames Water Utilities Limited

    Thames Water Utilities Limited sent a lettter by email to the Planning Inspectorate on 24 December 2013, asking about their interpretation of the Examining authority?s second written questions issued... Read more

  • View advice to Port of London Authority

    As the ExA is aware, the PLA has specific concerns about a number of sites along the river. This means that its interests in compulsory acquisition in relation to these sites will form elements of... Read more

  • View advice to David Gawthorpe

    Please see attached links for enquiry and response between David Gawthorpe and The Planning Inspectorate.

  • View advice to Rachel Mckoy

    Please see attached correspondence between Southwark London Borough Council and The Planning Inspectorate regarding the responses to the Examining Authority's first written questions.

  • View advice to Barney Holbeche

    To view the enquiry in its entirety please see attachment- 131108_WW010001_Holbeche SYR concerns about timing of hearings in relation to hearings.pdf

  • View advice to Hammersmith & Fulham Council

    Concern about the short preparation time between publication of written representations and hearings. See attached letter

  • View advice to Battersea Power Station Developm

    I am writing on behalf of the Battersea Land owning companies (BPS). We on behalf of BPS are in discussions with the Thames Water team in connection with the proposed temporary use of land owned by... Read more

  • View advice to Thames Water Utilities Ltd

    Panel Questions 4.19 to 4.23 deal with the Replacement Land Report which was submitted with the application as a piece of preliminary work, pending the passing and coming into force of the Growth and... Read more

  • View advice to Thames Water Utilities Limited

    Further to the discussion at the Preliminary Meeting, Thames Water submitted sample noise contour plans (attached) for advice as to whether, in this form, the material was likely to be useful to the... Read more

  • View advice to Thames Water Utilities Ltd

    Will representatives from London Boroughs be able to accompany the Panel of Examining Inspectors on accompanied site visits and is there any guidance about this?

  • View advice to Patricia Cuervo

    Royal Borough of Kensington and Chelsea (RBKC) enquired whether they were required to make a relevant representation; what the role of Local Impact Reports (LIR), Written Representations (WR) and... Read more

  • View advice to Save Your Riverside

    A representative of the ?Save Your Riverside? organisation telephoned the Inspectorate to ask what the likely timetable for the early stages of the process would be if the application for the Thames... Read more

  • View advice to Roland Gilmore

    Dear Sirs, I wish to formally register my interest in this application and to make submissions to the inspectorate. I have found the website relatively impenetrable and wish to ask if there is a... Read more

  • View advice to London Borough of H&F

    Please see correspondence from Councillor Nicholas Botterill attached

  • View advice to Emma Pousi

    Dear sir/madam I would like to send in a comment/make a representation about the Supersewer plans that will be submitted by Thames Water on 28th Feb 2013. Is this the correct postal address to... Read more

  • View meeting with Thames Water Utilities Ltd

    To discuss the progress of the Thames Tideway Tunnel Project ahead of anticipated submission of the application.

  • View advice to TWUL

    Advice sought on draft Funding Statement

  • View meeting with Thames Tideway Tunnel Forum

    Planning Inspectorate meeting with the Thames Tideway Tunnel Forum

  • View meeting with TWUL TWUL

    A meeting to discuss project progress in anticipation of submission.

  • View meeting with TWUL TWUL

    A meeting to discuss project progress to date

  • View meeting with TWUL TWUL

    A meeting to discuss project progress to date

  • View advice to TWUL

    TWUL requested confirmation of The Planning Inspectorate being able to advise on the content of its Funding Statement in respect of the Thames Tideway Tunnel application.

  • View meeting with Thames Water

    A meeting was held with TWUL to discuss the Environmental Statement and associated matters.

  • View meeting with Thames Water

    Meeting to discuss the draft Development Consent Order (DCO).

  • View advice to Thames Water Utilities Ltd

    Advice on Consultation report draft.

  • View meeting with TWUL

    A meeting to discuss the preparatory measures for the Thames Tunnel Waste Water project with regard to the examination timetable and general programming logic.

  • View advice to Berwin Leighton Paisner

    Please see letter from James Good of Berwin Leighton Paisner attached

  • View meeting with Berwin Leighton Paisner LLP

    A query following on from the meeting of 8 June 2012 with regard to transboundary effects.

  • View meeting with Thames Water Utilities Limited Thames Water Utilities Limited

    A meeting to discuss the draft Development Consent Order (DCO) for the proposed Thames Tideway Tunnel

  • View advice to Lewisham Borough Council

    Could you provide us with some advice on the issue of selecting alternative sites once the Thames Tunnel application is accepted. LB Lewisham object to both of the Thames Tunnel preferred sites... Read more

  • View meeting with Berwin Leighton Paisner LLP

    The advice given seeks to follow up 2 items that were discussed at the meeting on 17 April and which were not covered in detail in the Meeting Note that has recently been published on our website.... Read more

  • View meeting with Thames Water Utilities Limited

    A meeting to discuss the proposed Thames Tunnel by Thames Water Utilities Limited (TWUL); Statements of Common Ground (SOCG); the production of Local Impact Reports (LIR); and methods of joint... Read more

  • View meeting with Thames Water Utilities Limited

    A meeting between the Planning Inspectorate - National Infrastructure Directorate and Thames Water Utilities Limited to discuss project progress to date; Schedule 1 of the Draft Development Consent... Read more

  • View advice to Thames Water

    Mr Baggs requested the telephone conversation and discussed a request from the GLA and some London Boroughs for an extension to their second phase of pre application consultation. He was concerned... Read more

  • View meeting with Thames Water

    Meeting to discuss the progress of the project.

  • View meeting with Thames Water

    A project update and discussion about procedural requirements for application documents.

  • View advice to Thames Water

    Letter notifying the IPC that Thames Water's phase two public consultation in respect of the Thames Tunnel project commences on 4 November 2011.

  • View meeting with Thames Water

    To discuss the proposed Thames Tunnel project

  • View meeting with Ian Fletcher

    Meeting to discuss the proposed Thames Tunnel project

  • View advice to Jeremy Wood

    Correspondent emailed to make representation on the proposed Thames Tunnel project

  • View advice to Liberty Mosse

    Correspondent emailed to make representation on the proposed Thames Tunnel project

  • View advice to Paul Gardner

    Correspondent emailed to make representation on the proposed Thames Tunnel project

  • View advice to S Parvez

    Concerns about Thames Water's pre-application consultation in respect of the duties set out in the Planning Act 2008.

  • View meeting with John Manning

    Meeting with DEFRA to disucss the proposed Thames Tunnel project

  • View meeting with Eileen Thomas

    Meeting with Mott MacDonald (on behalf of DEFRA) to discuss the IPC's engagement with Thames Water in connection with the proposed Thames Tunnel project

  • View meeting with Thames Water

    To give s.51 advice on the content of Thames Water?s scoping report for the proposed Thames Tunnel project.

  • View advice to Clare Gibbons

    Letter to Thames Tunnel regarding consultees

  • View advice to Thames Water Utilities Ltd

    Thames Tunnel enquired to the IPC about the process required for a Development Consent Order

  • View meeting with DEFRA

    Meeting with DEFRA, CLG, various London Boroughs and pan-London Stakeholders to discuss the Thames Tunnel project

  • View advice to Susan Aistrup

    IPC's formal response to Thames Water's purported s46 notification

  • View advice to Thames Water Utilities Ltd

    Thames Tunnel enquired to the IPC about the process required for a Development Consent Order

  • View meeting with John Bourne

    Meeting with DEFRA and Thames Water to discuss the Thames Tunnel project

  • View meeting with Thames Water

    Meeting held on 12th October to discuss the Thames Tunnel project.