The list below includes a record of advice we have provided for this project.
-
Meeting regarding proposed non-material change application
-
Advice sought on draft application documents for an application to make a non material change to the DCO
-
Advice sought about making an application to make changes to the DCO
-
Objecting to the use of King Edward Memorial Park during the construction of the Thames Tideway Tunnel
-
Clarification on which matters in relation to sections 131 and 132 the Examining Authority are anticipating examining at the hearing on 17 January 2014
-
Advice sought regarding the publicity requirements associated with the need to advertsie an additional open floor hearing session in Deptford Lounge on 5th February 2014.
-
Thames Water Utilities Limited sent a lettter by email to the Planning Inspectorate on 24 December 2013, asking about their interpretation of the Examining authority?s second written questions issued ...
Read more
-
As the ExA is aware, the PLA has specific concerns about a number of sites along the river. This means that its interests in compulsory acquisition in relation to these sites will form elements of ma...
Read more
-
Please see attached links for enquiry and response between David Gawthorpe and The Planning Inspectorate.
-
Please see attached correspondence between Southwark London Borough Council and The Planning Inspectorate regarding the responses to the Examining Authority's first written questions.
-
To view the enquiry in its entirety please see attachment-
131108_WW010001_Holbeche SYR concerns about timing of hearings in relation to hearings.pdf
-
Concern about the short preparation time between publication of written representations and hearings.
See attached letter
-
I am writing on behalf of the Battersea Land owning companies (BPS). We on behalf of BPS are in discussions with the Thames Water team in connection with the proposed temporary use of land owned by B...
Read more
-
Panel Questions 4.19 to 4.23 deal with the Replacement Land Report which was submitted with the application as a piece of preliminary work, pending the passing and coming into force of the Growth and ...
Read more
-
Further to the discussion at the Preliminary Meeting, Thames Water submitted sample noise contour plans (attached) for advice as to whether, in this form, the material was likely to be useful to the E...
Read more
-
Will representatives from London Boroughs be able to accompany the Panel of Examining Inspectors on accompanied site visits and is there any guidance about this?
-
Royal Borough of Kensington and Chelsea (RBKC) enquired whether they were required to make a relevant representation; what the role of Local Impact Reports (LIR), Written Representations (WR) and Stat...
Read more
-
A representative of the ?Save Your Riverside? organisation telephoned the Inspectorate to ask what the likely timetable for the early stages of the process would be if the application for the Thames T...
Read more
-
Dear Sirs,
I wish to formally register my interest in this application and to make submissions to the inspectorate.
I have found the website relatively impenetrable and wish to ask if there is a ...
Read more
-
Please see correspondence from Councillor Nicholas Botterill attached
-
Dear sir/madam
I would like to send in a comment/make a representation about the Supersewer plans that will be submitted by Thames Water on 28th Feb 2013.
Is this the correct postal address to se...
Read more
-
To discuss the progress of the Thames Tideway Tunnel Project ahead of anticipated submission of the application.
-
Advice sought on draft Funding Statement
-
Planning Inspectorate meeting
with the Thames Tideway Tunnel
Forum
-
A meeting to discuss project progress in anticipation of submission.
-
A meeting to discuss project progress to date
-
A meeting to discuss project progress to date
-
TWUL requested confirmation of The Planning Inspectorate being able to advise on the content of its Funding Statement in respect of the Thames Tideway Tunnel application.
-
A meeting was held with TWUL to discuss the Environmental Statement and associated matters.
-
Meeting to discuss the draft Development Consent Order (DCO).
-
Advice on Consultation report draft.
-
A meeting to discuss the preparatory measures for the Thames Tunnel Waste Water project with regard to the examination timetable and general programming logic.
-
Please see letter from James Good of Berwin Leighton Paisner attached
-
A query following on from the meeting of 8 June 2012 with regard to transboundary effects.
-
A meeting to discuss the draft Development Consent Order (DCO) for the proposed Thames Tideway Tunnel
-
Could you provide us with some advice on the issue of selecting alternative sites once the Thames Tunnel application is accepted.
LB Lewisham object to both of the Thames Tunnel preferred sites wit...
Read more
-
The advice given seeks to follow up 2 items that were discussed at the meeting on 17 April and which were not covered in detail in the Meeting Note that has recently been published on our website. Tho...
Read more
-
A meeting to discuss the proposed Thames Tunnel by Thames Water Utilities Limited (TWUL); Statements of Common Ground (SOCG); the production of Local Impact Reports (LIR); and methods of joint working...
Read more
-
A meeting between the Planning Inspectorate - National Infrastructure Directorate and Thames Water Utilities Limited to discuss project progress to date; Schedule 1 of the Draft Development Consent Or...
Read more
-
Mr Baggs requested the telephone conversation and discussed a request from the GLA and some London Boroughs for an extension to their second phase of pre application consultation. He was concerned abo...
Read more
-
Meeting to discuss the progress of the project.
-
A project update and discussion about procedural requirements for application documents.
-
Letter notifying the IPC that Thames Water's phase two public consultation in respect of the Thames Tunnel project commences on 4 November 2011.
-
To discuss the proposed Thames Tunnel project
-
Meeting to discuss the proposed Thames Tunnel project
-
Correspondent emailed to make representation on the proposed Thames Tunnel project
-
Correspondent emailed to make representation on the proposed Thames Tunnel project
-
Correspondent emailed to make representation on the proposed Thames Tunnel project
-
Concerns about Thames Water's pre-application consultation in respect of the duties set out in the Planning Act 2008.
-
Meeting with DEFRA to disucss the proposed Thames Tunnel project
-
Meeting with Mott MacDonald (on behalf of DEFRA) to discuss the IPC's engagement with Thames Water in connection with the proposed Thames Tunnel project
-
To give s.51 advice on the content of Thames Water?s scoping report for the proposed Thames Tunnel project.
-
Letter to Thames Tunnel regarding consultees
-
Thames Tunnel enquired to the IPC about the process required for a Development Consent Order
-
Meeting with DEFRA, CLG, various London Boroughs and pan-London Stakeholders to discuss the Thames Tunnel project
-
IPC's formal response to Thames Water's purported s46 notification
-
Thames Tunnel enquired to the IPC about the process required for a Development Consent Order
-
Meeting with DEFRA and Thames Water to discuss the Thames Tunnel project
-
Meeting held on 12th October to discuss the Thames Tunnel project.