Thames Tideway Tunnel

Cyngor Adran 51

Mae'r rhestr isod yn cynnwys cofnod o gyngor a roddwyd gennym ar gyfer y prosiect hwn.

Mae dyletswydd statudol, o dan adran 51 Deddf Cynllunio 2008, ynglŷn â chais neu ddarpar gais. Mae hyn yn cynnwys cofnodi enw'r unigolyn a ofynnodd am y cyngor a'r cyngor a roddwyd. Mae'n rhaid i'r wybodaeth hon gael ei chyhoeddi.

Chwilio cyngor

Chwiliwch yn ôl geiriau allweddol neu enw'r unigolyn y rhoddwyd y cyngor iddo.

Yn dangos 1 i 25 o 59 o ddogfennau, gyda'r rhai mwyaf newydd yn gyntaf.

Canlyniadau fesul tudalen 25 | View 50 results per page | View 100 results per page

  • Gweld cyfarfod gyda Tideway London

    Meeting regarding proposed non-material change application

  • Gweld cyngor i Thames Water Utilities Lyd

    Advice sought on draft application documents for an application to make a non material change to the DCO

  • Gweld cyfarfod gyda Thames Water Utilities Ltd

    Advice sought about making an application to make changes to the DCO

  • Gweld cyngor i Herra Mindful Smile

    Objecting to the use of King Edward Memorial Park during the construction of the Thames Tideway Tunnel

  • Gweld cyngor i Thames Water Utilities Ltd

    Clarification on which matters in relation to sections 131 and 132 the Examining Authority are anticipating examining at the hearing on 17 January 2014

  • Gweld cyngor i Thames Water Utilities Ltd

    Advice sought regarding the publicity requirements associated with the need to advertsie an additional open floor hearing session in Deptford Lounge on 5th February 2014.

  • Gweld cyngor i Thames Water Utilities Limited

    Thames Water Utilities Limited sent a lettter by email to the Planning Inspectorate on 24 December 2013, asking about their interpretation of the Examining authority?s second written questions issued ... Darllen mwy

  • Gweld cyngor i Port of London Authority

    As the ExA is aware, the PLA has specific concerns about a number of sites along the river. This means that its interests in compulsory acquisition in relation to these sites will form elements of ma... Darllen mwy

  • Gweld cyngor i David Gawthorpe

    Please see attached links for enquiry and response between David Gawthorpe and The Planning Inspectorate.

  • Gweld cyngor i Rachel Mckoy

    Please see attached correspondence between Southwark London Borough Council and The Planning Inspectorate regarding the responses to the Examining Authority's first written questions.

  • Gweld cyngor i Barney Holbeche

    To view the enquiry in its entirety please see attachment- 131108_WW010001_Holbeche SYR concerns about timing of hearings in relation to hearings.pdf

  • Gweld cyngor i Hammersmith & Fulham Council

    Concern about the short preparation time between publication of written representations and hearings. See attached letter

  • Gweld cyngor i Battersea Power Station Developm

    I am writing on behalf of the Battersea Land owning companies (BPS). We on behalf of BPS are in discussions with the Thames Water team in connection with the proposed temporary use of land owned by B... Darllen mwy

  • Gweld cyngor i Thames Water Utilities Ltd

    Panel Questions 4.19 to 4.23 deal with the Replacement Land Report which was submitted with the application as a piece of preliminary work, pending the passing and coming into force of the Growth and ... Darllen mwy

  • Gweld cyngor i Thames Water Utilities Limited

    Further to the discussion at the Preliminary Meeting, Thames Water submitted sample noise contour plans (attached) for advice as to whether, in this form, the material was likely to be useful to the E... Darllen mwy

  • Gweld cyngor i Thames Water Utilities Ltd

    Will representatives from London Boroughs be able to accompany the Panel of Examining Inspectors on accompanied site visits and is there any guidance about this?

  • Gweld cyngor i Patricia Cuervo

    Royal Borough of Kensington and Chelsea (RBKC) enquired whether they were required to make a relevant representation; what the role of Local Impact Reports (LIR), Written Representations (WR) and Stat... Darllen mwy

  • Gweld cyngor i Save Your Riverside

    A representative of the ?Save Your Riverside? organisation telephoned the Inspectorate to ask what the likely timetable for the early stages of the process would be if the application for the Thames T... Darllen mwy

  • Gweld cyngor i Roland Gilmore

    Dear Sirs, I wish to formally register my interest in this application and to make submissions to the inspectorate. I have found the website relatively impenetrable and wish to ask if there is a ... Darllen mwy

  • Gweld cyngor i London Borough of H&F

    Please see correspondence from Councillor Nicholas Botterill attached

  • Gweld cyngor i Emma Pousi

    Dear sir/madam I would like to send in a comment/make a representation about the Supersewer plans that will be submitted by Thames Water on 28th Feb 2013. Is this the correct postal address to se... Darllen mwy

  • Gweld cyfarfod gyda Thames Water Utilities Ltd

    To discuss the progress of the Thames Tideway Tunnel Project ahead of anticipated submission of the application.

  • Gweld cyngor i TWUL

    Advice sought on draft Funding Statement

  • Gweld cyfarfod gyda Thames Tideway Tunnel Forum

    Planning Inspectorate meeting with the Thames Tideway Tunnel Forum

  • Gweld cyfarfod gyda TWUL TWUL

    A meeting to discuss project progress in anticipation of submission.