Project information
About the project
Type of application: Generating Stations
Name of applicant: North Lincolnshire Green Energy Park Limited
The Project consists of an Energy Recovery Facility (ERF) converting up to 650,000 tonnes per annum of Refuse Derived Fuel (RDF) to generate a maximum of 95 Mega Watts of electrical output (MWe) and/or 380 Mega Watts of thermal output (MWt) to provide power, heat and steam on the site of the operating Flixborough Wharf on the River Trent. The Project will incorporate battery storage, hydrogen production from the electrolysis of water, hydrogen storage, heat and steam storage. It will also include heat-treatment of bottom and fly ash, concrete block manufacturing, carbon dioxide capture and utilisation and an extended district heat network of 5km, power and gas network to service the nearby proposed housing development. Development at the site will also include the following associated measures to allow access to and from the site by road, rail or river, with a correspondingly reduced environmental impact: i. an extension to Flixborough Wharf; ii. the reopening of a 9km single track railway line that connects Flixborough Wharf with the steel works at Scunthorpe; iii. a railhead complex to handle the RDF and concrete products; and iv. a new road alignment to facilitate the flow of traffic accessing the site from the south.
View the developer's websiteProject stage
This project is at the decision stage.
The date set for this to be completed is 18 October 2024
Pre-application
Completed
This is where the applicant starts to create their application. The applicant is required to consult with people and organisations in the area. They must also create detailed documents about the impact the project could have on the environment.
It is important to get involved at this stage to influence the application before the applicant sends it to the Planning Inspectorate.
Find out what you can do at this stage and check our detailed guides.
Acceptance
Completed
This is when the applicant sends us their application documents. We check if we can accept the application for examination. We have 28 days to make this decision.
How the acceptance stage works and what happens next.
Pre-examination
Completed
The Examining Authority is appointed and is made up of one or more inspectors. Anyone who wants to have their say needs to register at this stage.
The applicant must publish that the application has been accepted by us. They include when and how parties can register to get involved. The time period for registering is set by the applicant but must be no less than 28 days.
The pre-examination stage usually takes about 3 months.
What happens during the pre-examination stage.
Examination
Completed
The Examining Authority will ask questions about the proposed development. The applicant and anyone who has registered to have their say can get involved and submit comments at each deadline in the timetable. You can also attend hearings that may take place. This stage takes up to 6 months.
What happens at the examination stage?
Recommendation
Completed
The Examining Authority writes its recommendation report. This must be completed and sent to the relevant Secretary of State within 3 months of the end of examination stage.
Making a recommendation.
Decision
In progress
The decision stage is when the relevant Secretary of State then reviews the report and makes the final decision. They have 3 months to make a decision.
Who makes the final decision.
What happens after the decision is made
Not started
Once the Secretary of State has made a decision, challenges can be made to the High Court. All procedures must be followed when making a challenge. The High Court will decide if there are grounds for a judicial review.
This must happen within 6 weeks.
What you can do after the decision has been made.Project location
Flixborough Wharf, Flixborough Industrial Estate, North Lincolnshire.
Get updates
Enter your email address to receive:
- updates on project progress
- information on how to have your say
- notifications when key documents are published
Contact us
Telephone
If you have an interested party number, have it with you when you call.
Telephone: 0303 444 5000
Open Monday to Friday: 9am to 4pm.
Closed on weekends and bank holidays.
NorthLincolnshireGreenEnergyProject@planninginspectorate.gov.uk.
When writing an email, quote the name of the project in the subject line.
We aim to respond within 10 working days.
Alternative formats
Call or email to ask for project documents in alternative formats such as PDF, large print, easy read, audio recording or braille.