Back to list North Lincolnshire Green Energy Park

Representation by Jotun Paints (Jotun Paints)

Date submitted
14 September 2022
Submitted by
Members of the public/businesses

Appreciated a wealth of documents, but as the upper tier COMAH site referenced in 6.2.16 of Vol 6, there appears to be only brief reference to our site with regard to risks both during construction and then future running and little understanding of what our specific hazards are, plus release of hydrogen and natural gas appears still to have residua risk in upper ALARP. Reviewed proposed layout NLGEP-FCE-XX-XX-DR-Y-5001 and there is hydrogen production and a loosely termed AGI, across the road from our solvent based warehouse, location of of our highest fire loading on site. Considering residual risk, concerned that this is adequately controlled and that the an incident on this proposed development would be a potential initiator for a major accident on this site. I have no doubt, we would/will be consulted at design stage as stated in risk assessment but siting what are hazardous installations in such close proximity to the only COMAH site existing on the industrial estate has been done without any consulatation. Further to that, more basic impacts during construction such as access to site, for standard operations but also particularly maintaining access for emergency services, I have not found. There may be no impact but nothing in construction stage that affects us, nut only an incident on our site possibly impacting construction work, nothing detailing if there is anything during construction that would limit our ability or emergency services to respond. Lastly we also have land in compulsory purchase section.