Back to list North Lincolnshire Green Energy Park

Representation by Bagmoor Wind Limited (Bagmoor Wind Limited)

Date submitted
15 September 2022
Submitted by
Members of the public/businesses

Bagmoor Wind Farm is located approximately 2 miles from the proposed development site. The disused railway, which we understand from an initial review of the documents available, is proposed to be reinstated and will cross through this operational wind farm, passing close to a number of turbine locations. Bagmoor Wind Farm has concerns over the proposal to reinstate this section of disused railway, where it crosses through the site boundary of the wind farm, due to the proximity of the route to the turbine locations. In addition to the turbines, at Bagmoor Wind Farm, there are buried high voltage cables and other services, plus overhead 33kV lines to consider. We need to make sure that the correct separation distances are maintained between the existing infrastructure and the proposed new development. Bagmoor Wind Farm would welcome the opportunity to engage on this topic to ensure the proposed plans are agreeable, and safe, for all involved parties.