View examination library (PDF, 502KB) containing document reference numbers
-
6.2 Environmental Statement - Volume 2, Appendix 13-5: Framework Construction Traffic Management Plan, Annex A: Proposed Access Layouts, Visibility Splays and Swept Paths - Part 2 of 3
(PDF, 32MB)
From East Yorkshire Solar Farm Limited
-
6.2 Environmental Statement Volume 6.2 - Appendix 15-1 Legislation, Policy and Guidance for Soils and Agricultural Land
(PDF, 220KB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-46 Photomontages - Viewpoint 10a: Tottering Lane junction, Gribthorpe (FOGGF13) Howden 20
(PDF, 17MB)
From East Yorkshire Solar Farm Limited
-
1.3 Application Form Signed
(PDF, 3MB)
From East Yorkshire Solar Farm Limited
-
6.2 Environmental Statement - Volume 2, Appendix 13-5: Framework Construction Traffic Management Plan
(PDF, 22MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 13-3 - Indicative HGV Routeing
(PDF, 5MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 15-2 - Predictive Agricultural Land Classification
(PDF, 5MB)
From East Yorkshire Solar Farm Limited
-
5.2 Appendix J Section 46 Letter and the Enclosures Sent to Planning Inspectorate (With Date)
(PDF, 6MB)
From East Yorkshire Solar Farm Limited
-
5.2 Appendix N Promotion of Consultation to Elected Representatives and Forums
(PDF, 404KB)
From East Yorkshire Solar Farm Limited
-
5.2 Appendix Q4 Section 47 (S47) Public Consultation
(PDF, 207KB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-47 Photomontages - Viewpoint 10b: Tottering Lane junction, Gribthorpe (FOGGF13) Howden 20
(PDF, 17MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 15-1 - Provisional and Post 1988 Agricultural Land Classification
(PDF, 5MB)
From East Yorkshire Solar Farm Limited
-
6.2 Environmental Statement - Volume 2, Appendix 9-2: Water Framework Directive (WFD) Assessment
(PDF, 5MB)
From East Yorkshire Solar Farm Limited
-
6.2 Environmental Statement - Volume 2, Appendix 10-5: Arboricultural Impact Assessment and Tree Protection Report
(PDF, 2MB)
From East Yorkshire Solar Farm Limited
-
6.2 Environmental Statement - Volume 2, Appendix 15-4: Communications with Natural England
(PDF, 3MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-6 - Zone of Theoretical Visibility with Surface Features - Substations
(PDF, 14MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-22 Viewpoint Photography - Viewpoint 13: View north east across arable and pastural farmland from the Howden20
(PDF, 3MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 17-1 - Zones of Influence - Development
(PDF, 4MB)
From East Yorkshire Solar Farm Limited
-
6.5 Environmental Statement - Environmental Mitigation and Commitments Register
(PDF, 330KB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 7-3 - Location of Archaeological Events
(PDF, 13MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-41 Photomontages - Viewpoint 4: Featherbed Lane PRoW (EASTB17), Howden 20
(PDF, 20MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 16-1 - Dust Risk Assessment Zones
(PDF, 4MB)
From East Yorkshire Solar Farm Limited
-
6.1 Environmental Statement - Volume 1, Chapter 17: Cumulative Effects and Interactions
(PDF, 387KB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-24 Viewpoint Photography - Viewpoint 15: View to the north west across arable farmland
(PDF, 3MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-37A Viewpoint Photography - Viewpoint 28: View North-west from Willitoft Road (south), Spaldington
(PDF, 2MB)
From East Yorkshire Solar Farm Limited
-
6.2 Environmental Statement - Volume 2, Appendix 1-1: EIA Scoping Report
(PDF, 25MB)
From East Yorkshire Solar Farm Limited
-
6.2 Environmental Statement - Volume 2, Appendix 8-5: Survey Report for Breeding Birds
(PDF, 5MB)
From East Yorkshire Solar Farm Limited
-
6.2 Environmental Statement - Volume 2, Appendix 1-4: Statement of Competence
(PDF, 193KB)
From East Yorkshire Solar Farm Limited
-
6.2 Environmental Statement - Appendix 2-1: Grazing Feasibility
(PDF, 218KB)
From East Yorkshire Solar Farm Limited
-
6.2 Environmental Statement - Volume 2, Appendix 8-8: Badger Survey Report - [CONFIDENTIAL]
(PDF, 77KB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 2-3 - Indicative Site Layout
(PDF, 37MB)
From East Yorkshire Solar Farm Limited
-
2.4 Streets, Rights of Way and Access Plan - Part 1 of 2
(PDF, 42MB)
From East Yorkshire Solar Farm Limited
-
5.2 Appendix G Published Statement of Community Consultation with Location and Date
(PDF, 5MB)
From East Yorkshire Solar Farm Limited
-
6.2 Environmental Statement Volume 6.2 - Appendix 9-1: Legislation, Policy and Guidance for Flood Risk, Drainage and Water
(PDF, 293KB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-23 Viewpoint Photography - Viewpoint 14: View to the north across arable farmland
(PDF, 4MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-36 Viewpoint Photography - Viewpoint 27 : View west from Hardmoor Lane, South Cliffe
(PDF, 4MB)
From East Yorkshire Solar Farm Limited
-
6.2 Environmental Statement - Volume 2, Appendix 7-1: Legislation, Policy and Guidance for Cultural Heritage
(PDF, 265KB)
From East Yorkshire Solar Farm Limited
-
6.2 Environmental Statement - Volume 2, Appendix 17-1: Shortlist of Cumulative Schemes
(PDF, 224KB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-5 - Zone of Theoretical Visibility with Surface Features - Solar PV Panels
(PDF, 15MB)
From East Yorkshire Solar Farm Limited
-
6.2 Environmental Statement - Volume 2, Appendix 10-4: Potential Representative Viewpoints
(PDF, 189KB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-18 Viewpoint Photography - Viewpoint 10a: Views across arable farmland to the east
(PDF, 4MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-21 Viewpoint Photography - Viewpoint 12a: View east across farmland from the edge of Gribthorpe
(PDF, 3MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 13-4 - Roads to Access Site
(PDF, 5MB)
From East Yorkshire Solar Farm Limited
-
6.1 Environmental Statement - Volume 1, Chapter 7: Cultural Heritage
(PDF, 372KB)
From East Yorkshire Solar Farm Limited
-
4.1 Statement of Reasons
(PDF, 281KB)
From East Yorkshire Solar Farm Limited
-
6.2 Environmental Statement - Volume 2, Appendix 8-2: Aquatic Ecology Report
(PDF, 9MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 9-5 - Surface Water Flood Risk
(PDF, 6MB)
From East Yorkshire Solar Farm Limited
-
6.1 Environmental Statement - Volume 1, Chapter 0: Table of Contents, Glossary and Abbreviations
(PDF, 210KB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 13-2 - Traffic Survey Locations
(PDF, 5MB)
From East Yorkshire Solar Farm Limited
-
7.4 Outline Design Principles Statement
(PDF, 1MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 9-3 - Ground Water Features and their Attributes
(PDF, 5MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 15-3 - Agricultural Land Classification Survey for the Solar PV Site
(PDF, 3MB)
From East Yorkshire Solar Farm Limited
-
6.1 Environmental Statement - Volume 1, Chapter 11: Noise and Vibration
(PDF, 393KB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-19 Viewpoint Photography - Viewpoint 10b: Views across arable farmland to the west
(PDF, 3MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-50 Photomontages - Viewpoint 14: A614, PRoW (EASTF15 and EASTF13), Burland
(PDF, 18MB)
From East Yorkshire Solar Farm Limited
-
7.6 Statutory Nuisance Statement
(PDF, 223KB)
From East Yorkshire Solar Farm Limited
-
2.1 Land Plan
(PDF, 7MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-55 Photomontages - Viewpoint 28: Willitoft Road (south), Spaldington
(PDF, 10MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 7-4 - Historic Landscape Characterisation
(PDF, 6MB)
From East Yorkshire Solar Farm Limited
-
5.2 Appendix K Section 47 Consultation Material
(PDF, 18MB)
From East Yorkshire Solar Farm Limited
-
5.2 Appendix P2 Section 42(1)(aa)
(PDF, 177KB)
From East Yorkshire Solar Farm Limited
-
6.1 Environmental Statement - Volume 1, Chapter 2: The Scheme
(PDF, 6MB)
From East Yorkshire Solar Farm Limited
-
6.1 Environmental Statement - Volume 1, Chapter 9: Flood Risk, Drainage and Water Environment
(PDF, 984KB)
From East Yorkshire Solar Farm Limited
-
6.2 Environmental Statement - Volume 2, Appendix 12-2: Communication with Mineral Planning Authorities
(PDF, 2MB)
From East Yorkshire Solar Farm Limited
-
6.2 Environmental Statement Volume 6.2 - Appendix 14-1: Legislation, Policy and Guidance for Human Health
(PDF, 212KB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-52 Photomontages - Viewpoint 16: Arglam Lane, Bursea Lane Ends
(PDF, 14MB)
From East Yorkshire Solar Farm Limited
-
7.16 Equality Impact Assessment
(PDF, 976KB)
From East Yorkshire Solar Farm Limited
-
2.8 Water Bodies in a River Basin Management Plans
(PDF, 16MB)
From East Yorkshire Solar Farm Limited
-
6.1 Environmental Statement - Volume 1, Chapter 14: Human Health
(PDF, 395KB)
From East Yorkshire Solar Farm Limited
-
6.2 Environmental Statement - Volume 2, Appendix 15-5: Soil Health Analysis Data
(PDF, 3MB)
From East Yorkshire Solar Farm Limited
-
6.2 Environmental Statement - Volume 2, Appendix 16-1: Legislation, Policy and Guidance for Other Environmental
(PDF, 403KB)
From East Yorkshire Solar Farm Limited
-
6.2 Environmental Statement - Volume 2, Appendix 8-7: Bat Survey Report
(PDF, 15MB)
From East Yorkshire Solar Farm Limited
-
6.2 Environmental Statement - Volume 2, Appendix 8-8: Badger Survey Report
(PDF, 185KB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 11-1 - Baseline Monitoring and Sensitive Receptor Locations
(PDF, 2MB)
From East Yorkshire Solar Farm Limited
-
7.7 Framework Construction Environmental Management Plan
(PDF, 531KB)
From East Yorkshire Solar Farm Limited
-
7.11 Appendix I Biodiversity Metric 4.0 Calculation
(PDF, 2MB)
From East Yorkshire Solar Farm Limited
-
Adequacy of Consultation Representation
(PDF, 309KB)
From Lancashire County Council
-
6.3 Figure 12-3 - 30-minute Drive Time from Site Boundary
(PDF, 6MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 17-3 - Locations of Short List Schemes
(PDF, 3MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-26 Viewpoint Photography - Viewpoint 17: Medium distance view to the west from Welham Bridge
(PDF, 4MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-27 Viewpoint Photography - Viewpoint 18: Long distance views to the west from Station Road
(PDF, 3MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-34 Viewpoint Photography - Viewpoint 25: View west from Portington Road
(PDF, 3MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 14-2 - Human Health Study Area Wards
(PDF, 5MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 16-2 - Authorised and Historic Landfills, Permitted Waste Sites and Waste Site Applications
(PDF, 5MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-28 Viewpoint Photography - Viewpoint 19: View east across arable land from Wressle Grange
(PDF, 4MB)
From East Yorkshire Solar Farm Limited
-
Adequacy of Consultation Representation
(PDF, 343KB)
From South Yorkshire Combined Authority
-
Adequacy of Consultation Representation
(PDF, 161KB)
From City of Doncaster Council
-
Adequacy of Consultation Representation
(PDF, 140KB)
From North Yorkshire Council
-
Adequacy of Consultation Representation
(PDF, 1MB)
From Leeds City Council
-
2.7 Statutory and Non-Statutory Sites or Features of Nature Conservation, and Important Habitats
(PDF, 17MB)
From East Yorkshire Solar Farm Limited
-
7.5 Grid Connection Statement
(PDF, 285KB)
From East Yorkshire Solar Farm Limited
-
2.3 Works Plan
(PDF, 37MB)
From East Yorkshire Solar Farm Limited
-
2.2 Crown Land Plan
(PDF, 8MB)
From East Yorkshire Solar Farm Limited
-
7.15 Framework Skills, Supply Chain and Employment Plan
(PDF, 323KB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-45 Photomontages - Viewpoint 9: PRoW (BUBWB25) Howden 20
(PDF, 12MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-51 Photomontages - Viewpoint 15: Fir Tree Farm, PRoW (SPALF04, SPALB05, SPALF06, SPALF09)
(PDF, 14MB)
From East Yorkshire Solar Farm Limited
-
6.3 Figure 10-49 Photomontages - Viewpoint 12a: Manor Farm, Gribthorpe PRoW (FOGGF03)
(PDF, 6MB)
From East Yorkshire Solar Farm Limited
-
2.5 Traffic Regulation Measures Plan - Part 1 of 3
(PDF, 47MB)
From East Yorkshire Solar Farm Limited
-
Section 51 advice to the Applicant
(PDF, 169KB)
-
6.3 Figure 10-35 Viewpoint Photography - Viewpoint 26: View south west from All Saints Church, Holme Upon Spalding Moor
(PDF, 2MB)
From East Yorkshire Solar Farm Limited