Back to list East Yorkshire Solar Farm

Representation by Barry Philip Carpus

Date submitted
31 January 2024
Submitted by
Members of the public/businesses

The damage to the local infrastructure will be considerable during the building phase, large trucks will be using B- roads and lanes that only currently carry local traffic and many of the lanes are single track and have passing places. The other issue is the proposed height of the panels, they will be visible from many areas and will be an appalling blot on the landscape. The size of the project is a major concern, and the area is apparently planned to be surrounded by a high fence to keep people safe. From the planning documents it seems that the height of the fences and their proximity to the road edge will give a terrible visual feel to anyone travelling or walking down the lanes.