Back to list A66 Northern Trans-Pennine Project

Representation by Mr P Tavener (Mr P Tavener)

Date submitted
2 September 2022
Submitted by
Members of the public/businesses

On behalf of my Clients, I intend to raise through written representations and replies, and if appropriate oral representations at a Hearing and Compulsory Acquisition Hearing concerns relating to the following points: The adequacy of information provided by the Applicant, including but not limited to information relating to: The extent and location of land and rights required including public rights of way Accommodation Works Drainage Impact on retained land The availability of more suitable routes for the proposed scheme; and more efficient designs in regard to accesses. The suitability of the design of service roads and impact on emergency services, and the surrounding areas and businesses The requirement for, and safety implications in relation to the proposed slip road onto the A66 The proposed signage designs The safety of the proposed designs on farmers and business along the A66 Demonstration of the availability of necessary funding We have not had sight of Position Statements prepared by the Applicant or any subsequent reply from the Planning Inspectorate, and reserve the right to raise further points relating to these if necessary.

Attachment(s)