Gatwick Airport Northern Runway Amserlen yr archwiliad

Mae amserlen yr archwiliad yn dangos dyddiadau digwyddiadau a therfynau amser ar gyfer cyflwyniadau.

Os ydych wedi cofrestru i leisio'ch barn, gallwch wneud hyn yn ystod y cam archwilio.

Y cam archwilio

Agorodd yr archwiliad ar 27 February 2024

Caeodd yr archwiliad ar 27 August 2024

Terfynau amser a digwyddiadau i ddod

Nid oes unrhyw derfynau amser neu ddigwyddiadau

Terfynau amser a digwyddiadau blaenorol

6 Chwefror 2024 - Procedural Deadline A

Caeedig

Procedural Deadline A

Deadline for receipt by the Examining Authority (ExA) of:

  • Written submissions on Examination procedure, including any submissions about the draft Examination Timetable.
  • Requests to be heard orally at the Preliminary Meeting (PM), including which agenda items you wish to speak on, and why your points need to be made orally rather than in writing.
  • Requests by Interested Parties (IP) to participate in the Open Floor Hearings on 28 February 2024.
  • Requests by IPs to participate in the Issue Specific Hearings between 29 February and 6 March 2024.
  • Applicant’s submission of the Land Rights Tracker.
  • Suggested locations for site inspections, including the reason for nomination, issues to be observed there, and whether the location(s) can be accessed using public highways.

27 Chwefror 2024 - Preliminary Meeting

Caeedig

Preliminary Meeting (PM)

28 Chwefror 2024 - Open Floor Hearing 1

Caeedig

Open Floor Hearing 1 (OFH1)

28 Chwefror 2024 - Open Floor Hearing 2

Caeedig

Open Floor Hearing 2 (OFH2)

29 Chwefror 2024 - Issue Specific Hearing 1

Caeedig

Issue Specific Hearing 1 (ISH1)

  • ISH1 on the Case for the Proposed Development

1 Mawrth 2024 - Issue Specific Hearing 2

Caeedig

Issue Specific Hearing 2 (ISH2)

  • ISH2 on Control Documents/ the Development Consent Order

5 Mawrth 2024 - Issue Specific Hearing 3

Caeedig

Issue Specific Hearing 3 (ISH3)

  • ISH3 on Socio-economics

5 Mawrth 2024 - Issue Specific Hearing 4

Caeedig

Issue Specific Hearing 4 (ISH4)

  • ISH4 on Surface Transport

6 Mawrth 2024 - Issue Specific Hearing 5

Caeedig

Issue Specific Hearing 5 (ISH5)

  • ISH5 on Aviation Noise

6 Mawrth 2024 - Reserved for continuation of ISHs 1 to 5 (if required)

Caeedig

Reserved for continuation of ISHs 1 to 5 (if required)

7 Mawrth 2024 - Accompanied Site Inspection 1

Caeedig

Accompanied Site Inspection 1 (ASI1)

12 Mawrth 2024 - Deadline 1

Caeedig

Deadline 1

Deadline for receipt by the Examining Authority (ExA) of:

  • Post-Hearing submissions, including written summaries of oral submissions to the Hearings held between 28 February and 6 March 2024.
  • Comments on Relevant Representations.
  • Written Representations (WR).
  • Summaries of WRs exceeding 1500 words.
  • Local Impact Reports (LIR) from any local authorities.
  • Comments on any responses to section 51 advice or Pre-examination Procedural Decisions submitted by the Applicant before the Preliminary Meeting.
  • Comments on any Additional Submissions accepted at the discretion of the ExA.
  • Comments on the Applicant’s Land Rights Tracker.
  • Requests by Interested Parties to participate in a further Open Floor Hearing.
  • Requests by Affected Persons to participate in a Compulsory Acquisition Hearing.
  • Notification by Statutory Parties of their wish to be considered as an IP.
  • Notification of wish to have future correspondence delivered electronically, including confirmation of email address.
  • Initial Statements of Common Ground (SoCG) requested by the ExA.
  • Statement of Commonality for SoCGs.
  • Applicant’s draft itinerary for a further Accompanied Site Inspection (if held).
  • Applicant’s updated Book of Reference (BoR) and Schedule of Changes to the BoR (if required) in clean and tracked versions.
  • Applicant’s updated Navigation Document in clean and tracked versions.
  • Any further information requested by the ExA under Rule 17 of The Infrastructure Planning (Examination Procedure) Rules 2010.

26 Mawrth 2024 - Deadline 2

Caeedig

Deadline 2

For receipt by the ExA of:

  • Comments on the Applicant’s draft itinerary for a further Accompanied Site Inspection (if held).
  • Updated Principal Areas of Disagreement Summary Statements (PADSS).
  • Draft legal agreement(s).
  • Applicant’s updated Navigation Document in clean and tracked versions.
  • Any further information requested by the ExA under Rule 17 of The Infrastructure Planning (Examination Procedure) Rules 2010.
  • Comments on any further information/ submissions received by Deadline 1.

28 Mawrth 2024 - The ExA’s Written Questions (ExQ1)

Caeedig

Publication by the ExA of:

  • The ExA’s Written Questions (ExQ1)

19 Ebrill 2024 - Deadline 3

Caeedig

Deadline 3

For receipt by the ExA of:

  • Responses to ExQ1.
  • WRs on the Applicant’s proposal to amend its Development Consent Order (DCO) application.
  • Summaries of WRs submitted at Deadline 3 exceeding 1500 words.
  • Comments on WRs submitted by Deadline 1.
  • Comments on LIRs.
  • Progressed draft legal agreement(s) and/ or an update on progress.
  • Applicant’s updated draft DCO in clean and tracked versions.
  • Applicant’s Schedule of Changes to the draft DCO.
  • Applicant’s first update to the Land Rights Tracker.
  • Applicant’s updated Navigation Document in clean and tracked versions.
  • Any further information requested by the ExA under Rule 17 of The Infrastructure Planning (Examination Procedure) Rules 2010.
  • Comments on any further information/ submissions received by Deadline 2.

30 Ebrill 2024 - Issue Specific Hearing 6

Caeedig

Issue Specific Hearing 6 (ISH6)

  • ISH6 on Climate Change

1 Mai 2024 - Issue Specific Hearing 7

Caeedig

Issue Specific Hearing 7 (ISH7)

  • ISH7 on Other Environmental Matters (topics to be confirmed)

2 Mai 2024 - Compulsory Acquisition Hearing 1

Caeedig

Compulsory Acquisition Hearing 1 (CAH1)

2 Mai 2024 - Open Floor Hearing 3

Caeedig

Open Floor Hearing 3 (OFH3)

3 Mai 2024 - Date reserved for a further Accompanied Site Inspection

Caeedig

Please note that this date has been cancelled as the ASI is not required.

15 Mai 2024 - Deadline 4

Caeedig

Deadline 4

For receipt by the ExA of:

  • Post-Hearing submissions, including written summaries of oral submissions to the Hearings held during w/c 29 April 2024.
  • Comments on responses to ExQ1.
  • Comments on WRs submitted by Deadline 3.
  • Applicant’s updated Navigation Document in clean and tracked versions.
  • Comments on the Applicant’s first update to the Land Rights Tracker.
  • Any further information requested by the ExA under Rule 17 of The Infrastructure Planning (Examination Procedure) Rules 2010.
  • Comments on any further information/ submissions received by Deadline 3.

6 Mehefin 2024 - Deadline 5

Caeedig

Deadline 5

For receipt by the ExA of:

  • Updated PADSSs.
  • Progressed SoCGs.
  • Progressed Statement of Commonality for SoCGs.
  • Applicant’s updated BoR and Schedule of Changes to the BoR (if required) in clean and tracked versions.
  • Applicant’s second update to the Land Rights Tracker.
  • Applicant’s updated Navigation Document in clean and tracked versions.
  • Any further information requested by the ExA under Rule 17 of The Infrastructure Planning (Examination Procedure) Rules 2010.
  • Comments on any further information/ submissions received by Deadline 4.

17 Mehefin 2024 - Dates reserved for Hearings

Caeedig

Dates reserved for any:

  • Issue Specific Hearing(s) (if required).
  • Open Floor Hearing(s) (if required).
  • Compulsory Acquisition Hearing(s) (if required).

26 Mehefin 2024 - Deadline 6

Caeedig

Deadline 6

For receipt by the ExA of:

  • Post-Hearing submissions, including written summaries of oral submissions to the Hearings held during w/c 17 June 2024 (if held).
  • Progressed draft legal agreement(s) and/ or an update on progress.
  • Applicant’s updated draft DCO in clean and tracked versions.
  • Applicant’s Schedule of Changes to the draft DCO.
  • Applicant’s updated Navigation Document in clean and tracked versions.
  • Comments on the Applicant’s second update to the Land Rights Tracker.
  • Any further information requested by the ExA under Rule 17 of The Infrastructure Planning (Examination Procedure) Rules 2010.
  • Comments on any further information/ submissions received by Deadline 5.

1 Gorffennaf 2024 - The ExA’s Written Questions (ExQ2)

Caeedig

Publication by the ExA of:

  • The ExA’s Further Written Questions (ExQ2) (if required).

15 Gorffennaf 2024 - Deadline 7

Caeedig

Deadline 7

For receipt by the ExA of:

  • Responses to ExQ2 (if issued).
  • Applicant’s third update to the Land Rights Tracker.
  • Applicant’s updated Navigation Document in clean and tracked versions.
  • Any further information requested by the ExA under Rule 17 of The Infrastructure Planning (Examination Procedure) Rules 2010.
  • Comments on any further information/ submissions received by Deadline 6.

25 Gorffennaf 2024 - Publication by the RIES

Caeedig

Publication by the ExA of:

  • The Report on the Implications for European Sites (RIES) and any associated questions (if required).

29 Gorffennaf 2024 - Dates reserved for further Hearings

Caeedig

Hearings

Dates reserved for any:

  • Issue Specific Hearing(s) (if required).
  • Open Floor Hearing(s) (if required).
  • Compulsory Acquisition Hearing(s) (if required).

30 Gorffennaf 2024 - Compulsory Acquisition Hearing 2

Caeedig

Compulsory Acquisition Hearing 2 (CAH2)

30 Gorffennaf 2024 - Issue Specific Hearing 9

Caeedig

Issue Specific Hearing 9 (ISH9)

  • ISH9 on Environmental Matters

7 Awst 2024 - Deadline 8

Caeedig

Deadline 8

For receipt by the ExA of:

  • Post-Hearing submissions, including written summaries of oral submissions to the Hearings held during w/c 29 July 2024 (if held).
  • Comments on responses to ExQ2 (if issued).
  • Progressed draft legal agreement(s) and/ or an update on progress.
  • Applicant’s updated draft DCO in clean and tracked versions.
  • Applicant’s Schedule of Changes to the draft DCO.
  • Applicant’s updated Navigation Document in clean and tracked versions.
  • Comments on the Applicant’s third update to the Land Rights Tracker.
  • Any further information requested by the ExA under Rule 17 of The Infrastructure Planning (Examination Procedure) Rules 2010.
  • Comments on any further information/ submissions received by Deadline 7.

14 Awst 2024 - Publication of the proposed schedule of changes to the draft DCO

Caeedig

Publication by the ExA of:

  • The ExA’s proposed schedule of changes to the draft DCO (if required).

21 Awst 2024 - Deadline 9

Caeedig

Deadline 9

For receipt by the ExA of:

  • Responses to the RIES (if issued). Responses to the ExA’s proposed schedule of changes to the draft DCO (if issued).
  • Finalised PADSSs.
  • Finalised SoCGs.
  • Finalised Statement of Commonality for SoCGs.
  • List of matters not agreed where any SoCG could not be finalised.
  • Signed and dated legal agreement(s).
  • Applicant’s final draft DCO (Microsoft Word) in clean and tracked versions.
  • Applicant’s final draft DCO (PDF) in clean and tracked versions.
  • Applicant’s final draft DCO to be submitted in the SI template with the SI template validation report.
  • Applicant’s finalised Schedule of Changes to the draft DCO.
  • Applicant’s finalised Statement of Reasons in clean and tracked versions.
  • Applicant’s final BoR and Schedule of Changes to the BoR in clean and tracked versions.
  • Applicant’s final Land Rights Tracker.
  • Applicant’s final Navigation Document in clean and tracked versions.
  • Any further information requested by the ExA under Rule 17 of The Infrastructure Planning (Examination Procedure) Rules 2010.
  • Comments on any further information/ submissions received by Deadline 8.

27 Awst 2024 - Deadline 10

Caeedig

Deadline 10

For receipt by the ExA of:

  • Any further information requested by the ExA under Rule 17 of The Infrastructure Planning (Examination Procedure) Rules 2010

27 Awst 2024 - End of Examination

Caeedig

The ExA is under a duty to complete the examination of the application by the end of the period of six months