1. Section 51 advice
  2. Advice in detail

Meeting with Gatwick Airport Limited

Back to list

Enquiry

Meeting with
Gatwick Airport Limited
Date of meeting
16 September 2022
Enquiry type
Meeting

During the meeting between the Applicant and the Planning Inspectorate on 16 September 2022, the Applicant queried how socio-economic effects from diminution in property value had been addressed through scoping for other similar projects. Please note that a meeting note of the meeting held on 16 September 2022 has been published on the s51 advice tab of the project webpage

Advice given

In response to your query about property values, I had a look at Heathrow and Luton and whilst for Luton, the topic of property prices has not [been] addressed through scoping, Heathrow had mentioned providing financial compensation to households to reduce any adverse effects. The Inspectorate requested that the ES demonstrates how this reduces adverse effects. I would recommend looking at guidance as I said, both for human health and for socio-economics as hopefully this can provide some sort of steer. Here is a link to the Heathrow Scoping Opinion and Scoping Report page on our website: https://infrastructure.planninginspectorate.gov.uk/projects/london/expansion-of-heathrow-airport-third-runway/?ipcsection=docs&stage=1&filter1=Environmental+Impact+Assessment+Scoping Ultimately, the Inspectorate requires the ES to provide evidence sufficient to support the Applicant’s position on the matter and where possible, methodologies should be agreed with the relevant consultation bodies and supported by appropriate guidance