Search by the person or group making the submission or the content of the submission.
-
Access from A17 along Wash road is single track. Wash Road will be closed off during certain times, access to my house. Middlecott Almshouses are 17th century listed building. Shallow foundations....
Read more
-
The Black Sluice Internal Drainage Board (the Board) is an independent authority constituted under the Land Drainage Act 1930, with duties “to exercise a general supervision over all matters relating...
Read more
-
Dear Sir / Madam, We refer to the above application for development consent. Trinity House is the General Lighthouse Authority for England, Wales, the Channel Islands and Gibraltar with powers...
Read more
-
With regard to the request for consultation response relating to the above project I would advise that the route of the over land cable path runs through the area under the control of Lindsey Marsh...
Read more
-
Concern over impact of using single track lanes with no passing places for access to staging depot situated on Cravens Lane Concerns about large lorries on single track lane outside our 17th century...
Read more
-
The project will be immensely impactful to my house, with one of the trenches being dug close to my property, a compound created around 100 metres of my house, and a key route for construction traffic...
Read more
-
We act on behalf of a number of landowners who own property which is crossed by the proposed scheme. We wish to reserve the right to make representations in respect of the project, including (but not...
Read more
-
St John's College (SJC) in general support the drive for renewable energy and SJC recognise that this will require infrastructure improvements to ensure the power can be connected to the electricity...
Read more
-
The Crown Estate requests to be registered as an Interested Party in the examination of the Outer Dowsing Offshore Wind Farm. Our interest in the project is that Total Energies and Corio Generation...
Read more
-
We are an operating authority established in an area a of special drainage need in the Lincolnshire Fens, we have with permissive powers to undertake work to secure clean water drainage and water...
Read more
-
The MCA will be responding to the ExA on matters concerning the safety of maritime navigation and maritime emergency response. MCA will provide comments on the Navigation Risk Assessment, Shipping &...
Read more
-
[NATS Ref. SG33815] Dear Sirs, NATS has been engaged and is in talks with the Applicant in the respect of the anticipated impact of the proposal, on its operations. Accordingly NATS wishes to register...
Read more
-
The Water Management Alliance represent several Internal Drainage Boards in the area for this project. We are likely involved with regards to Byelaw Consent and any pertaining land legal agreements.
-
Outer Dowsing Offshore Wind Farm Relevant Representation made to Planning Inspectorate by South Holland Internal Drainage Board 14th May 2024 Internal Drainage Board interest A part of the Outer...
Read more
-
The UK Chamber of Shipping is the trade association for the UK shipping industry, representing some 200 members, operating 900 vessels equalling 18 million GT in capacity, trading around the UK and...
Read more
-
Dear Planning Inspectorate, Due to the length of our response and the available word count in this box, the Marine Management Organisation will be emailing our Relevant Representation and Principle...
Read more
-
The Dogger Bank South Projects are formally registering as an interested party to the proposed development with principle interest in the conclusions of the Habitats Regulations Assessment and onward...
Read more
-
The Outer Dowsing Offshore Wind Farm project infrastructure runs into the catchment area of Welland & Deepings Internal Drainage Board (W&DIDB) and ultimately terminates within our area with the...
Read more
-
The route for onshore cables passes through or near the playing field. Plus all roads and traffic problems during construction
-
LPA were consulted and wish to submit our comments
-
The project will impact me due to the close proximity to my property. Noise, vibration and site lighting could be an issue. Also HGV routes will affect access to my property,
-
DIO Safeguarding have previously submitted comments in regard to this development. An assessment will be completed on the information provided to establish if the development has any adverse impacts...
Read more
-
The concerns I have are to the house regarding structural damage to my cottage caused by the vibrations from the heavy plant and vehicles that are laying the cables and using the haul road as it...
Read more
-
My principle concern is Lincolnshire being used as a conduit for power generated offshore which is required in other parts of the country - mainly London and the South East. The offshore cables from...
Read more
-
National Highways has been appointed by the Secretary of State for Transport as a strategic highway company and is the highway authority, traffic authority and street authority for the Strategic Road...
Read more
-
Thank you for consulting the Forestry Commission on this project. As a Non-Ministerial Government Department, the Forestry Commission provide no opinion supporting or objecting to an application....
Read more
-
The parish will need a full update about the impact this project will have on the local residents. Impacts of drilling down to insert cables on local old houses that are near to the underground...
Read more
-
Lincolnshire Wildlife Trust (LWT) has been actively involved with this application since the pre-application stage, providing written responses to the applicant's published documentation and...
Read more
-
At the AGM of Well Parish Meeting held on Tuesday 7th May 2024, the Meeting voted unanimously to continue to Object to Outer Dowsing Offshore Wind (ODOW) on the following grounds: 1. CONFLICTS OF...
Read more
-
Interruption of land drainage and possible damage to cable by agricultural machine
-
I am very interested in, and concerned by, the choice of generating and transmitting AC power. Also, the location of the landfall site and the choice of connection point to the grid. For various...
Read more
-
APPLICATION BY GT R4 LIMITED (OUTER DOWSING OFFSHORE WIND) FOR THE OUTER DOWSING OFFSHORE WIND DEVELOPMENT ORDER 202[X] PLANNING INSPECTORATE REFERENCE: EN010130 SECTION 56 PLANNING ACT 2008: RELEVANT...
Read more
-
Relevant Representation This comment is a relevant representation by the Interested Party in connection with the Project. Terms defined in this comment shall have the following meaning: Interested...
Read more
-
Outer Dowsing - Anglian Water Relevant Representation (dated 12/06/24) Anglian Water (AW) is the statutory water and wastewater services provider for the proposed Outer Dowsing project order limits....
Read more
-
Relevant Representation This comment is a relevant representation by the Interested Party in connection with the Project. Terms defined in this comment shall have the following meaning: Interested...
Read more
-
Relevant Representation This comment is a relevant representation by the Interested Party in connection with the Project. Terms defined in this letter shall have the following meaning: Interested...
Read more
-
Please see attached.
-
Ossian Offshore Wind Farm Ltd (Ossian) wish to register as an interested party in the Development Consent Order Examination for the Outer Dowsing Offshore Wind Farm (ODOWF) for the following reasons:...
Read more
-
As Agents for numerous landowners affected by the Outer Dowsing Cable Route we wish to express concern on the approach to agreeing terms for the easement and surveys and the detail in the terms.
-
Relevant Representation This comment is a relevant representation by the Interested Party in connection with the Project. Terms defined in this letter shall have the following meaning: Interested...
Read more
-
The Planning Inspectorate Ref EN010130 APPLICATION FOR A DEVELOPMENT CONSENT ORDER BY THE PLANNING INSPECTORATE (ON BEHALF OF THE SECRETARY OF STATE FOR ENERGY SECURITY AND NET ZERO) UNDER SECTION 56...
Read more
-
Birds On The Edge (BOTE) partnership is a joint initiative between the National Trust for Jersey (NTJ), the Government of Jersey Natural Environment Department, and Durrell Wildlife Conservation...
Read more
-
see separate covering note
-
Breesea Limited, Soundmark Wind Limited, Sonningmay Wind Limited together with Optimus Wind Limited (the “Hornsea 2 Project Companies”) own and operate an operational offshore windfarm with a...
Read more
-
Brown & Co LLP are retained by interested parties to make Relevant Representation objecting to ODOW’s DCO application on their behalf. Grounds of Objection: 1. Insufficient cable burial depth Cropping...
Read more
-
RELEVANT REPRESENTATION Representation by Cadent Gas Limited (Cadent) to the Outer Dowsing Development Consent Order (DCO) Cadent is a licensed gas transporter under the Gas Act 1986, with a statutory...
Read more
-
The proposed project poses some level of risk to our existing project ranging from encroachment to our existing assets. the extension of the SAC also poses financial risk to the project unless...
Read more
-
Brown & Co LLP are retained by Doreen Belton, [REDACTED] have been instructed to make this Relevant Representation objecting to ODOW’s DCO application on their behalf. Doreen Belton has met with the...
Read more
-
see separate covering note
-
The Environment Agency has reviewed the Development Consent Order (DCO) application, the Environmental Statement (ES) chapters and supporting documents relevant to environmental issues within its...
Read more