Chwiliwch yn ôl yr unigolyn neu'r grŵp sy'n gwneud y cyflwyniad neu gynnwys y cyflwyniad.
-
Anglian Water Services is the statutory water and wastewater services provider for the proposed pipeline route from Immingham to Theddlethorpe in North East Lincolnshire and East Lindsey District...
Darllen mwy
-
ASSOCIATED PETROLEUM TERMINALS (IMMINGHAM) LIMITED AND HUMBER OIL TERMINALS TRUSTEE LIMITED PROPOSED VIKING CCS CARBON DIOXIDE PIPELINE DEVELOPMENT CONSENT ORDER RELEVANT REPRESENTATION 1 Introduction...
Darllen mwy
-
• No attempt to meet to discuss commercial terms whatsoever and a lack of meaningful consultation with the landowners and their agents. • No attempt to discuss a methodology for the pipeline...
Darllen mwy
-
Please see attached
-
Calor Gas Limited are the owners and operators of the Calor Cylinder Distribution site, which is located off Manby Road (A1173) and is used for the storage and distribution of liquefied petroleum gas...
Darllen mwy
-
No attempt to meet to discuss commercial terms whatsoever and a lack of meaningful consultation with the landowners and their agents. No attempt to discuss a methodology for the pipeline construction...
Darllen mwy
-
Historic England Advice - Our ref PL00794831 Viking CSS. The Historic Buildings and Monuments Commission for England (HBMCE) is better known as Historic England, and we are the Government’s adviser on...
Darllen mwy
-
• Failure to agree commercial terms due to a lack of meaningful consultation with the landowners and their agents • Failure to agree a method statement for the pipeline construction and failure to...
Darllen mwy
-
The Marine Management Organisation (MMO) will retain a watching brief on this proposal. A draft deemed marine licence has not been submitted, therefore the MMO have no comments at present. However if...
Darllen mwy
-
• Failure to agree commercial terms due to a lack of meaningful consultation with the landowners and their agents • Failure to agree a method statement for the pipeline construction and failure to...
Darllen mwy
-
•No attempt to meet to discuss commercial terms whatsoever and a lack of meaningful consultation with the landowners and their agents. •No attempt to discuss a methodology for the pipeline...
Darllen mwy
-
• Failure to agree commercial terms due to a lack of meaningful consultation with the landowners and their agents • Failure to agree a method statement for the pipeline construction and failure to...
Darllen mwy
-
Relevant Representation of National Grid Electricity Transmission Plc in respect of the Viking CCS Pipeline DCO (the “Project”) This relevant representation is submitted on behalf of National Grid...
Darllen mwy
-
Viking CCS Pipeline Project (EN070008) SECTION 56 PLANNING ACT 2008: RELEVANT REPRESENTATION OF NATIONAL HIGHWAYS LIMITED NATIONAL HIGHWAYS LIMITED (“National Highways”) has been appointed by the...
Darllen mwy
-
Please advise if there is an e mail address I can copy document to. Thank you. Date: 15 January 2024 Our ref: 24768 Your ref: EN07 0008 The Planning Inspectorate Major Applications & Plans Temple Quay...
Darllen mwy
-
Thank you for the opportunity to register as an Interested Party. North East Lincolnshire Council is a host authority. We have been liaising directly with the developer for some time now and have...
Darllen mwy
-
North Lincolnshire Council is aware that as the host Authority we will be automatically registered as an Interested Party in the Viking CCs Pipeline examination, under Section 102(1)(c) of the...
Darllen mwy
-
The following representations are submitted on behalf of Northern Powergrid (Yorkshire) Plc (‘Northern Powergrid’) as an electricity undertaker for the area within which the Viking CCS Pipeline DCO...
Darllen mwy
-
Application by Chrysaor Production (U.K.) Limited (“Chrysaor”) for an Order Granting Development Consent for the Viking CCS Pipeline ("the Project") 1. This Relevant Representation is submitted on...
Darllen mwy
-
PHILLIPS 66 LIMITED PROPOSED VIKING CCS CARBON DIOXIDE PIPELINE DEVELOPMENT CONSENT ORDER RELEVANT REPRESENTATION Introduction 1.1 This is a relevant representation (“RR”) for and on behalf of...
Darllen mwy
-
• Failure to agree commercial terms due to a lack of meaningful consultation with the landowners and their agents • Failure to agree a method statement for the pipeline construction and failure to...
Darllen mwy
-
• Failure to agree commercial terms due to a lack of meaningful consultation with the landowners and their agents • Failure to agree a method statement for the pipeline construction and failure to...
Darllen mwy
-
• Failure to agree a method statement for the pipeline construction and failure to provide clarity regarding construction depth of the pipeline and assurances that the land can be farmed going forward...
Darllen mwy
-
Thank you for your consultation regarding the above development. The UK Health Security Agency (UKHSA) welcomes the opportunity to comment on your proposals at this stage of the project. Please note...
Darllen mwy
-
1. Agreement on unfarmable severed areas; 2. Management of severed land; 3. Control of (injurious) weeds on stored soils; 4. Maintaining on-going water supplies to residential premises; 5....
Darllen mwy