Filter

A57 Link Roads (previously known as Trans Pennine Upgrade Programme)

Relevant representations (registration comments)

Search by the person or group making the submission or the content of the submission.

Showing 876 to 900 of 909 representations, newest first.

Results per page 25 | View 50 results per page | View 100 results per page

  • Joan Rutherford

    I OBJECT to the proposed A57 Link Roads for the following reasons: * likely increase in traffic levels leading to noise and increased pollution; * likely increase in traffic accidents; * impacts on... Read more

  • John J. Bower

    I am registering my objection to the proposed scheme, on the basis that what is proposed will not achieve any beneficial results. This directly affects me as a landowner

  • John Rourke

    Planning Inspectorate Reference: TR010034 With regard to the above. I wish to confirm my total support for the bypass construction and reject any attempt by whatever party to cancel the same. The... Read more

  • Justin Coyne

    Points raised by myself 1 congestion 2 pollution 3 alternative to the link road A57 4 environmental impacts

  • Keith Buchan

    I am writing to register as an objector to this scheme in somewhat unusual circumstances. I am a Chartered Transport Planning Professional and have some 40 years experience in transport planning. I... Read more

  • Laura Blake

    I do not believe this scheme will improve traffic, in fact I believe it would increase traffic, and doesn't comply with national policies for climate change and modal shift to walking, cycling and... Read more

  • Linda Walker

    I am very concerened that the scheme as proposed will: 1) do nothing for Tintwistle, where residents are desperate for some relief from traffic and pollution 2)increase traffic through Glossop and on... Read more

  • Lynn Winspear

    As a resident of Bamford my concerns about the proposed Mottram bypass are as follows: The bypass will enable much freer flow of traffic from the M67 directly over Snake Pass, an already highly... Read more

  • Margaret Thompson

    The proposed A57l Link road is overdue due and essential to the are.

  • Maxine Pigram

    I wish to register my opposition to the A57 Link Road. This proposal will not ease traffic congestion and is likely to increase it as more traffic will be descending on this already congested area. I... Read more

  • Michael Bowman

    This by pass needs to be be built as the traffic is ridiculous or you put a 7.5ton limit on the woodhead pass

  • National Grid Electricity Transmission plc (National Grid Electricity Transmission plc)

    Dear Sir/Madam REPRESENTATION BY NATIONAL GRID ELECTRICITY TRANSMISSION PLC (“NGET”) TO THE A57 Link Roads (previously known as Trans Pennine Upgrade Programme) DCO (“THE PROJECT”) NGET wishes to make... Read more

  • Nina Beard

    This By pass is badly needed to improve the health & safety of residents on A628. Too many houses have been built & are continuing to be built without any regard to infrastructure being upgraded to... Read more

  • Norwich & Norfolk Friends of the Earth (Norwich & Norfolk Friends of the Earth)

    I wish to explain in detail the amount of carbon emissions resulting from the construction of the road/s and during it's lifetime, and that such plans could be illegal to put into place because they... Read more

  • Patricia Mary Gray

    In my view the proposed A57 Link Road will do nothing to alleviate the problems in Hollingworth and Tintwistle. It is a very expensive proposal which could end up not pleasing anybody. My preferred... Read more

  • Paul Bruce

    If this was down south it would of been built years ago.shows again that us up north have no choice .if they had to suffer the traffic we have then they would be marching on no10.

  • Paula de Felipe Martinez

    I oppose the building of the Mottram bypass known as the A57 link roads, where I live. It has been stablished that: 1) The scheme would increase traffic. Even though I personally stand to benefit from... Read more

  • Peak District National Park Authority (Peak District National Park Authority)

    The Peak District National Park (PDNP) lies to the east of the scheme; therefore, none of the works have a direct impact. However, the Environmental Statement (ES) raises concerns for the Peak... Read more

  • Public Health England (Public Health England)

    Thank you for your consultation regarding the above development. Public Health England (PHE) welcomes the opportunity to comment on your proposals at this stage of the project and can confirm that:... Read more

  • Ray Collins

    The A57 Link Road proposal will do nothing to solve the problems of cross pennine traffic along the Woodhead and Snake passes. The current proposal will, on Highways England's own figures increase... Read more

  • Richard Hallows

    I have read the conditions and want this bypass to go ahead

  • Richard Hawker

    I object to this road scheme. As a nation, we should not be squandering our depleted financial resources on such schemes, which, on past performance, alleviate congestion for a short few years, and... Read more

  • Richard Holland

    It is my belief that the Examination should pay particular attention to the following issues that arise from the scheme: 1. The scheme envisages and ensures an increase in traffic, displacing the... Read more

  • Richard Leyshon

    I wish to object to the A57 Link Roads scheme on the grounds that: 1. the scheme will not meet its stated aims. Rather, by encouraging and increasing traffic through Glossop, Hollingworth and... Read more

  • Harrison Elliott on behalf of Robert Largan MP (Robert Largan MP)

    Planning Inspectorate 15 September 2021 Dear Sirs Re: A57 Link Roads Planning Inspectorate Reference: TR010034 As the Member of Parliament for High Peak and as a resident of Glossop, I am registering... Read more