  • Radiation Free Lakeland (Radiation Free Lakeland)

    Radiation Free Lakeland do not recognise the legality of this consultation. "There should be no commitment to a large programme of nuclear fission power until it has been demonstrated beyond... Read more

  • Roderick Orr-Ewing

    1. Site Selection I am concerned that the site is at risk from the effects of climate change, principally seal level rise and flooding. The site could become an island containing 5 nuclear reactors... Read more

  • Roger Hall

    I have lived in Suffolk for all my 75 years, we have endured 2 nuclear power stations at Sizewell, the countries biggest docks at Felixstowe, the largest of shore wind farm, massive power lines, new... Read more

  • Roger Holmes

    I am particularly interested in the future increase of traffic as my property is about 50ft away from the A12. But this is as nothing compared to the concerns of the long term storage of radioactive... Read more

  • Ruth Redgrave

    My concerns re EDF's DCO application are: 1. Site Selection I believe that the site at Sizewell is at risk from climate change, sea level rise and flooding. Coastal erosion and processes could impact... Read more

  • Sara-Jane Eaton

    I am very concerned about the proposals for Sizewell C. I am concerned about the potential damage to the Suffolk coastline and the negative impact that this will have on its rare species and habitats.... Read more

  • Sarah Doe

    To whom it may concern I wish to raise the following issues of concern about Sizewell C. As someone who lives close by to the proposed site and visits the area frequently I am compelled to express my... Read more

  • Sarah Zins

    I list below my areas of concern about Sizewell C. 1. Technology • I consider that the technology under consideration could be outdated by the time that Sizewell C is built, or nuclear output may no... Read more

  • Simon Ransome

    I strongly object to the building of nuclear power station Sizewell C on the following grounds. The down side costs are too huge to contemplate , particularly the pollution caused by construction inc... Read more

  • Steve Black

    This is a huge white elephant that Electricty is more expensive than renewables and the resulting waste will pollute the earth and will endanger many generations of mankind. It will be too late to... Read more

  • Sue Baugh

    I have many concerns about the construction of and need for a nuclear power plant at Sizewell C. Below are my main concerns. LOCATION This is the wrong project in the location. The Suffolk coast is at... Read more

  • Susan Sapsed

    As a mother, grandmother and great grandmother my main concerns are for the younger generations who will live with the results of the inspectorate's decision for many years. These concerns include:... Read more

  • Tabitha Jones

    I wish to raise the following issues of concern about Sizewell C. 1. Site Selection I believe it is the wrong project in the wrong place: Site at risk from climate change, sea level rise and flooding.... Read more

  • Trevor Fisk

    At the end of sizewell b construction. Tourism was virtually nil. It took nearly 1w years before it started to return. I fear things will be much worse this time as more workers in the area will mean... Read more

  • Tristan Winter

    I completely support this project, the local area needs the money,jobs and infrastructure that will be delivered by the successful application for building this power station. Leiston has been... Read more

  • A C Lonsdale

    The prohibitive cost of Sizewell C prevents it being a viable project. It also prevents expansion in renewables, which is the way forward. Neither Sizewell A nor Sizewell B brought permanent... Read more

  • Alan lofting

    The technology of nuclear fission is rapidly becoming outdated and as is well known the costs are far greater than renewable technologies . The possible connection with China is dismaying as it leaves... Read more

  • Alex Sainsbury

    Sizewell C would likely be an economic disaster. EDf’s current EPR model nuclear power stations are not functional anywhere, not in Finland, France, nor at Hinkley Point. EDF have publicly admitted... Read more

  • Alexandra Langdon

    I wish to raise the following issues of concern about Sizewell C. Site Selection I believe it is the wrong project in the wrong place. It will have an Adverse impact on adjacent internationally... Read more

  • Alice Bridges

    I have loved Suffolk and lived in the area since 1986. I wish to raise the following concerns about Sizewell C. 1. Site Selection I believe it is the wrong project in the wrong place · Site at... Read more

  • Alice Bridges

    Relevant Representations of Stop Sizewell C (the campaign name of Theberton and Eastbridge Action Group on Sizewell Ltd) 1. Application Explanatory Memorandum We wish to raise concerns about the... Read more

  • Alison Dennison

    1. The site This is the wrong project and the wrong place for it because: The coastline site is incredibly fragile with a history of erosion which is being made worse by climate change, leading to... Read more

  • Alistair Gordon-Brown

    The EPR project by EDF has proven to be impossible to complete economically. The Finish experience should ,as a pilot project, be scrutinised during the planning process. Starting in 2005 it is not... Read more

  • Andrew Reid

    The application made by EDF fails to address key issues which matter to residents in East Suffolk, resulting in an unsustainable transport strategy. By failing to actively pursue rail-led... Read more

  • Anglian Water Services Ltd (Anglian Water Services Ltd)

    Thank for you the opportunity to comment on the Sizewell C Power Station project. Anglian Water is considered to be a statutory consultee for nationally significant infrastructure projects as... Read more