  • Christine Collett

    I wish to register as an Interested Party in the hearings on the Sizewell C planning application. I fully endorse the Stop Sizewell C’s Relevant Representation and all that is contained therein, and... Read more

  • Christine Silver

    I oppose the building of Sizewell C on the following grounds:- 1. Safety issues - Fukushima, Chernobyl etc. No safe way of disposing of radioactive waste. 2. Site - unstable coastline, AONB, Minsmere,... Read more

  • Darren Halford

    Sizewell C The B1112 was closed for a stretch of 20m for 2 days at Theberton. This meant an additional 10km and 20mins drive diverted along tracks not meant for two-way traffic nor wider vehicles.... Read more

  • Daryl Ash

    Site position. The Proposed site is in AONB and is just too big. This is a potential flood area so increase in water from site increases this risk. Impact on RSPB, a world renowned nature reserve will... Read more

  • David Moodie

    I wish to register the following concerns: 1. The nuclear industry has a history of delays and cost increases. We would be better advised investing further in renewable energy as those projects come... Read more

  • Deborah Booth

    We live in Harrogate and for 20 years have lived in France, but over this time we and our children have had many holidays in Eastbridge from which we have visited Minsmere. We have found nothing like... Read more

  • Derek Eaton

    I am very concerned about the proposals for Sizewell C. I am concerned about the potential damage to the Suffolk coastline and the negative impact that this will have on its rare species and habitats.... Read more

  • Dominic Giles

    I oppoae the planned "sizewell c" project primarily on environmental concerns. The world needs to be transitioning towards "green", renewable, sustainable energy options. There are plenty to choose... Read more

  • Dr Jed Boardman

    Relevant Representation Sizewell C I wish to raise the following issues of concern about Sizewell C. 1. Site Selection • New energy sources that are developing and the fact that the development will... Read more

  • Eleanor Jenkin

    EDF Stage 4 Consultation for Sizewell C 27/09/20 I am a resident of East Suffolk and as such very familiar with the Suffolk Heritage Coast. I would like to register as an interested party to the... Read more

  • Emma Jackson

    I fully support the building of Sizewell C. It has been a long time in the planning and can not be built soon enough. It will bring much needed jobs to the area and stimulate the local economy. I do... Read more

  • Emma Lucy Victoria Norton

    The Suffolk coast is drastically eroding. Sea levels are rising and the site will be flooded by 2100. Extreme annual sea events will happen by 2050. Building on a flood risk site is utter madness. The... Read more

  • Fiona Curtis

    The validity of the project. The former Energy Secretary (who as I understand it approved Hinkley Point) and current leader of the Liberal Democrat Party, Ed Davey has this evening (27.09.20) appeared... Read more

  • Gail GordonBrown

    It is a colossal waste of tax payers money. It is very expensive electricity.No other country in the world is contemplating this type of investment as green renewable energy is so much cheaper and... Read more

  • Gina Gow

    I wish to raise the following concerns about Sizewell C. 1. Site Selection The site is unsuitable The coast is one of the fastest eroding coasts in Europe The area will see rising sea levels and... Read more

  • Griff Chamberlain

    I wish to raise the following issues of concern about Sizewell C. 1. The location of the site • The site is at risk of rising sea levels and flooding as predicted by climate change studies • Academic... Read more

  • Harry Smith

    I wish to make the case that the proposed planning and development of Sizewell C would be a complete and total disaster for the natural environment and also local residents and tourism to the area.... Read more

  • Helen Hepburn

    I have been a resident of Suffolk for 50 years. I am a keen supporter of wildlife, belonging to many organisations such as the RSPB, Butterfly Conservation Trust, and Wildlife Trusts. I am also a keen... Read more

  • Ian Booth

    We live in Harrogate and for 20 years have lived in France, but over this time we and our children have had many holidays in Eastbridge from which we have visited Minsmere. We have found nothing like... Read more

  • Ian Castle

    In my view the forecast costs and completion time will both over run, on this sort of contract history tells us exactly that. By the time the station is generating it will be redundant. It will be... Read more

  • James Eaton

    I am very concerned about the proposals for Sizewell C. I am concerned about the potential damage to the Suffolk coastline and the negative impact that this will have on its rare species and habitats.... Read more

  • James McLeod

    My concerns about Sizewell C concern the construction time and disruption that will be caused to the whole area. • The wildlife and habitat which will be lost forever • The terrible loss of amenity... Read more

  • James Youngman

    The site selected is unsuitable. Rising sea levels over the next 100 years are likely to make the site an island containing 5 nuclear reactors and their waste. The impact on nearby international... Read more

  • Jane Blore

    - Lack of meaningful engagements and results from landowners concerns - Concerns over environmental impact of the project - Scheme design concerns – provisions for severed land etc, access -... Read more

  • Jeff Higgott

    Impact on adjacent and nearby Sites of Special Scientific Interest Projected and actual cost and funding