Search by the person or group making the submission or the content of the submission.
-
Will the inter connector have an adverse affect on the location where I live and will the surrounding area suffer environmental damage?
-
The primary area of my concern is the route of the proposed interconnector, especially through the Milton area of Portsmouth. This is in relation to the inconvenience in the construction/installation...
Read more
-
Dear Sir / Madam We refer to the above application for development consent in respect of the Aquind Interconnector Trinity House is the General Lighthouse Authority for England, Wales, the Channel...
Read more
-
Hambledon PC believes that it is important to represent the interests of the residents of the Parish, since they will inevitably be affected by road access issues during installation of the...
Read more
-
We will be formally responding the the Draft DCO proposals by the deadline set. Our comments and recommendations will cover Land Contamination and groundwater protection to safe guard Portsmouth...
Read more
-
Our home is 8m from the proposed cable, my wife has a [] with is effected by magnetic fields, plus Aquind failed to answer some of my concerns. Eg. noise (buzz) from cable, effect on house prices.
-
I spent many years working in the Electricity Supply Industry and am acutely aware of the need for a secure and reliable energy supply. I believe this outweighs all other considerations.
-
The Aquind proposal has an impact on where I reside. The proposal is to access a track to bring in the equipment which my garden overlooks. there is also an option that a telegraph pole in my garden...
Read more
-
Sport England has a statutory duty to protect playing field which has been used or last used within the last 5 years. We also have a non-statutory responsibility to protect existing sports facilities...
Read more
-
Hello, I would like to object to the plans for the site off Locksway Road in the old St James' Hospital grounds. There will be so much disruption to the already busy, congested queued up roads, over...
Read more
-
Associated British Ports (ABP), in its capacity as statutory harbour authority for the Port of Southampton, has received correspondence from Aquind in relation to this project. ABP has been identified...
Read more
-
Application by AQUIND Limited (Promoter) for an Order Granting Development Consent for the AQUIND Interconnector (Order). Objection by Southern Gas Networks Plc (SGN). Addleshaw Goddard LLP acts on...
Read more
-
I disagree with the planned route for the interconnector. The plan is to take the cable corridor through the most densely populated city in the UK, outside of London. Portsmouth is a city that is...
Read more
-
I refer to the Aquind Interconnector application to which I would like to make a representation on the following grounds: 1. There is no provision for additional temporary parking in lieu of the loss...
Read more
-
The AQUIND proposal is based upon siting two six/seven storey buildings on some 9 acres of land in the middle of farming country, with close proximity to the South Downs National Park. In order to...
Read more
-
I wish to object to Aquind's choice of landing spot insomuch as they have chosen to make landfall on the most densely populated Island in the UK and will cause massive traffic upheaval on one of the...
Read more
-
I cannot believe that anyone could think it was a good idea to bring the cables through one of the most congested cities in the country. There are so many alternatives so why make life even more...
Read more
-
The proposed route for the marine cables of the Aquind Interconnector crosses the proposed Rampion Extension offshore wind farm site. It is noted that the routeing criteria outlined in the...
Read more
-
I am a landowner within the Primary Consultation Zone Height of the two proposed connector halls at 22-26 metres will change character of area from rural to industrial and harm the visual setting...
Read more
-
As a neighbouring Local Authority we would like to register as an interested party in order to keep track of the application and assess any impacts on our local residents, which are likely to be...
Read more
-
The following is offered in response to the submitted application documents: Fisheries Liaison and Coexistence Plan It is noted that a number of fisheries mitigation measures have been identified...
Read more
-
I am worried about the effects for the Aquind interconnector that has now been accepted for examination by the planning Inspectorate. I believe this will not be examined locally and I have grave...
Read more
-
The route chosen for the cables and if an alternative, less disruptive route is available The disruption to traffic and residents during the installation of cables The heat emissions once cables are...
Read more
-
My submissions will include comments on: The need for the interconnector The positioning of the interconnector and why it has to be placed in the countryside and not nearer to landfall or on an...
Read more
-
If allowed I am concerned at the following: 1 - The noise from the substation in a particularly quiet area and its impact on the community and SDNPA from the transformers and cooling equipment. 2 -...
Read more
-
JNCC are a public body that advises the UK government and devolved administrations on UK-wide nature conservation. In terms of this application, we will be advising on the nature conservation impacts...
Read more
-
Registering as an interested party as the proposed cable route from Anmore Road to the interconnector site may possibly be running along the other side of my boundary and that of Salt Box Barn. If the...
Read more
-
This Representation summarises the position of CPRE Hampshire We consider that specific and relevant policies clearly indicate that a Development Consent Order should be refused for the reasons set...
Read more
-
Objection Dramatic impact on the local area both visual and audible especially around the Lovedean area Major disruption to the road networks along the cable route and major effect on local...
Read more
-
Representation by National Grid Electricity Transmission Plc and National Grid Gas Plc (together “National Grid”) Application by Aquind Limited for an Order Granting Development Consent for the AQUIND...
Read more
-
Representation by National Grid Electricity Transmission Plc and National Grid Gas Plc (together “National Grid”) Application by Aquind Limited for an Order Granting Development Consent for the AQUIND...
Read more
-
I object to the laying of the HV electricity cables within and outside the Portsmouth boundary as proposed by Aquind. There is a real danger of radiation from the cables up through the ground if these...
Read more
-
I live in a house which will be close to the route the cable will be taking. 1. I would like to be kept informed about how far away the cable will be. 2. I would like to know how the possibility of...
Read more
-
Dear Sir, I am writing to you about the proposed Aquind Interconnector, which will land in Portsmouth. The proposals and lack of public consultation are causing significant concern to residents along...
Read more
-
The Parish Council would like to repeat its request that an effective traffic management plan is produced and then managed to minimise the disruption to traffic in Horndean and in particular, to...
Read more
-
Whilst I have many concerns about the route of the proposed cable through Portsmouth my main concern is with the suggested route from Bransbury Park to the allotments via Yeo Court. Yeo Court is...
Read more
-
The Crown Estate manages property and rights which are owned by Her Majesty in right of the Crown. This portfolio includes around half of the foreshore and almost the entire seabed out to 12 nautical...
Read more
-
My objections lie with the Con,vertor Station- - to the overall height of the building, inspite of being lowered into the surrounds , and its final visual impact on the landscape. - the effect of the...
Read more
-
Our interest is essentially from a landscape aspect. What is proposed is a massive building, some 7 stories high, within the open countryside. If approved, the landscape impact is bound to be very...
Read more
-
I am writing as both a resident and the owner of a small business directly on the route of the Cable Corridor proposed by Aquind. I strongly disagree with the entire proposal to make landfall on...
Read more
-
AS THE TENANT OF WINCHESTER COLLEGE AT DENMEAD FARM, THE CABLING FOR THE INTERCONNECTOR WILL PASS THROUGH THE FARM WHICH I CURRENTLY FARM WITH ARABLE CROPS
-
1.Proposed route will cause excessive disruption to the east side of Portsmouth, already suffering from considerable traffic flow problems. 2.That the route could have been through a less densely...
Read more
-
APLEAL (Action to Protect the Living Environment Around Lovedean) is a community action group representing residents in Lovedean, where the proposed Aquind interconnector station will be located, and...
Read more
-
Outreach of Consultation Location Carbon Footprint Long term Maintenance of Screening Impact on residents and local businesses Impact on school children Traffic management issues Options not properly...
Read more
-
I own a plot of grazing land measuring 1 1/2 acres in Broadway Lane, Lovedean. My land is used for grazing horses. Aquind are proposing to use 104 square metres of my land to plant hedging and to have...
Read more
-
I would like to register my interest as a resident living close to the proposed interconnector site and raise my objections to the Aquind project on the following grounds. Due to the sheer size of the...
Read more
-
Aquind's proposed development route will have a significant impact on land and properties belonging to the University of Portsmouth. The current plans will cause disruption to the University’s...
Read more
-
I am opposing the Aquind Limited's application for a DCO based the following reasons: - UK Statistical Information relating to energy consumption since 2000 - Climate Emergency and Strategic Planning...
Read more
-
The South Downs National Park borders the proposed location of the Convertor Station on three sides and in places it is just 200-300m from the National Park boundary. We would wish to participate in...
Read more
-
Please see attached
-
Please see attached
-
General issues 1. No evidence is provided that this energy supply is in fact ‘green’. 2. The use of the fibre optic link for commercial purposes is against the regulations 3. Design Principles for...
Read more
-
I object very strongly to the proposed Aquind cable going through one of the most densely populated cities in Europe. It will cause a horrendous amount of disruption and inconvenience to residents,...
Read more
-
Relevant Representation This Relevant Representation is hereby submitted who wish to be registered as an Interested Party for the forthcoming Examination of the AQUIND Interconnector Development...
Read more
-
This Relevant Representation is submitted on behalf of the Owners of Little Denmead Farm ("the Farm") who wish to be registered as an organisation Interested Party for the forthcoming Examination of...
Read more
-
1) Information about these works has only recently been posted on fixtures in and around Milton Common. They are severely weather damaged. They are very hard to see. I have spoken to a number of users...
Read more
-
Havant Friends of the Earth support the application, with reservations. In Support: With other interconnectors, Aquind will support the transition to more renewable sources of energy in the UK, by...
Read more
-
I would like to know how this is going to affect the surrounding area. Trinity estates have received a planning application from Aquind.. I would like to know what impact this is going to cause myself...
Read more
-
I do not think this plan is in the interest of my city or my local area. This proposal will cause traffic mayhem, destruction of our beautiful common. I believe there is a less intrusive way of doing...
Read more
-
Residents feel distrust and anger towards the application that has been put forward. The complete lack of information over the last 2 years has meant that we have not known what the proposed route of...
Read more
-
Historic England (retaining the formal title of the Historic Buildings and Monuments Commission for England) is the government service championing England’s heritage and giving expert, constructive...
Read more
-
I am concerned about the proposed Aquind electricity supply cable making landfall in Eastney and the effect of the development required to continue this cable through its proposed route from Eastney,...
Read more
-
I wish to object to the proposed Aquind Interconnector and plan on making an in depth written representation. ---------------------------------------------------------- I object to the Aquind...
Read more
-
I wish to make known my negative opinion of the application and the negative impact the work would have on the land it would pass through.
-
This Association represents the interests of all local grassroots football leagues, youth and adult, male and female. We object in the strongest terms to these proposals. The impact that the works...
Read more
-
Thank you for your consultation regarding the above development. Public Health England (PHE) welcomes the opportunity to comment on your proposals at this stage of the project and can confirm that: 1....
Read more
-
Traffic and parking problems
-
This Relevant Representation is submitted on behalf of Robin Jefferies who wishes to be registered as an Interested Party for the forthcoming examination of the AQUIND Interconnector Development...
Read more
-
I wish to object to the Aquind Interconnector as Portsmouth cannot cope with the disruption to the island. Portsmouth Council have objected to this also and I wish to be registered as an interested...
Read more
-
concerned about the impact during and after the proposal
-
This Relevant Representation is submitted on behalf of the Owners of Hillcrest, Old Mill Lane, Lovedean ("the Property") who wish to be registered as an organisation Interested Party for the...
Read more
-
I own a business which is based in the proposed area for this project and I believe it will have a significant negative impact on my business and also the people in the community we serve. The points...
Read more
-
I reject the necessity of this project due to the transport, pollution, wildlife devastation and disruption to community open places whilst providing no benefit to the people of portsmouth.
-
Portsmouth is already congested with traffic problems and heavily populated, in fact I understand it to be the most populated city outside of London. Conbined with the fact that we're an island, it's...
Read more
-
I wish to object to the Aquind Interconnector and will be submitting a more detailed written representation. My main points will include the chaos its work will cause to Portsmouth
-
I live on [Redacted]. To the back there is a small nature reserve. Ripping into this will be devastating to the people and wildlife that live here. Further down ripping into a close community narrow...
Read more
-
Residents feel distrust and anger towards the application that has been put forward. The complete lack of information over the last 2 years has meant that we have not known what the proposed route of...
Read more
-
Residents feel distrust and anger towards the application that has been put forward. The complete lack of information over the last 2 years has meant that we have not known what the proposed route of...
Read more
-
That the route will cause unnecessary disruption That the impact on wildlife will be irreparable That the destruction of habitats is unnecessary That there are better and less disruptive options
-
The proposed project is not wanted by the people or City of Portsmouth. It will cause major disruption to a major artery, the Eastern Road, one of only three routes into the city. Portsmouth is an...
Read more
-
This will cause major traffic issue and effect local wildlife
-
Residents feel distrust and anger towards the application that has been put forward. The complete lack of information over the last 2 years has meant that we have not known what the proposed route of...
Read more
-
It makes no sense to land the supply in the southern end of Portsea Island. It only makes sense to land it at the northern end of Langstone harbour.
-
Outline for representation Route a) potential gridlock in and out of Portsmouth b) request rationale for proposed route to previous submission and location of interconnector The % of the UK country...
Read more
-
There is no need to import energy from another country, alternatives such as wind power should be investigated. Much damage will be done to the local wildlife and environment. Landfall could be at the...
Read more
-
Portsmouth is the most highly populated island city in Britain. This means that the digging up of one of the 3 roads in and out of the city will cause major disruption. There are many less populated...
Read more
-
Residents feel distrust and anger towards the application that has been put forward. The complete lack of information over the last 2 years has meant that we have not known what the proposed route of...
Read more
-
The UK has little difficulty in generating sufficient energy for its needs. Further until the UK government has fully investigated renewable energy within the UK, developing market opportunities that...
Read more
-
The intention by Aquind to lay this cable in the route outlined will cause unacceptable disruption to many Portsmouth residents, allotment owners, dog walkers as well as causing irreparable damage to...
Read more
-
I think there are valid points to raise in line with the economic growth and the potential to affect our revenue growth throughout what will be months of disruption. Whilst We fully accept that this...
Read more
-
Objections to Aquind plan to place interconnector at Eastney and run through Milton, Baffins and along the Eastern Rd.
-
I object most strongly to the proposal. Digging up roads and communities when Langstone Harbour is available is wrong
-
I am shortly going to be moving into Meon Rd. Public consultation for this project has been extremely poor. There are questions over the access to information via the USB sticks that were all were not...
Read more
-
This is a single representation from Hampshire County Council (the Council) which summarises the current position of the Authority. The response progresses discussions which have taken place to date...
Read more
-
Following the Planning Inspectorate’s acceptance of an application for a Development Consent Order (DCO) for Aquind Interconnector, Havant Borough Council (HBC) is a host Borough requests to be...
Read more
-
I wish to object to the Aquind Interconnector for various reasons and have a written objection to submit. Residents feel distrust and anger towards the application that has been put forward. The...
Read more
-
Dear Sir/Madam Highways England wishes to register as an interested party in respect of the application by Aquind Limited for an Order Granting Development Consent for the Aquind Interconnector....
Read more
-
I object to the Aquind application and will submit a full written objection at the relevant time. I am a resident living in the effected area of this application. My main but not whole objections at...
Read more
-
We have reviewed the information provided in relation to the Aquind Interconnector Proposal (Planning Inspectorate Reference EN020022). At this time, we propose that a HOLDING OBJECTION is made until...
Read more
-
I am against this proposal on the grounds of the pollution , the upheaval, and destruction of the last green area in Portsmouth..