Search by the person or group making the submission or the content of the submission.
-
Effect on the local environment Effect on local wildlife Effects on existing inadequate local infrastructure Long term financial efficacy of foreign investment based UK infrastructure Security...
Read more
-
I object to the Sizewell C Project on the following grounds: - Environmental concerns including SSSI destruction, woodland felling, the quantity of water required and how this affects the fragile...
Read more
-
Live near the proposed site and also have land that would be used for road improvements I wish to make views on the impact of the new road lay out on farms and land used to make the new roads along...
Read more
-
The roads will be overloaded with heavy traffic. I have seen Hinckly Point and I cannot imagine that enormous building site here next to Minsmere, a wildlife reserve of national importance, it would...
Read more
-
1. Mollett’s Partnership is a family-owned, diversified farming business operating over a 37-acre land-holding spanning the parishes of Farnham and Benhall. 2. We object to a number of matters...
Read more
-
I am an owner occupier of a property beside the A12 Marlesford , a small village north east of Wickham Market. I am aware of the EDF proposals for the Sizewell C Project ,which if approved, will have...
Read more
-
LIVING CLOSE TO THE RAILWAY LINE I AM VERY WORRIED ABOUT THE NUMBER OF FREIGHT TRAINS DURING THE NIGHT. THEY WILL MAKE SUFFICIENT DISTURBANCE TO INTERRUPT OUR SLEEP WITH THE NOISE AS THEY PASS THROUGH...
Read more
-
I wish to make representation that this project is entirely unsuitable for the area. It is a massive industrial project and this is a rural backwater with no industrial history and none of the...
Read more
-
The development of Sizewell C in the middle of the AONB, would have a damaging impact on Sizewell Marshes SSSI, the local wetland and all its wildlife - including otters. Otters were driven to...
Read more
-
I wish to raise the following issues of concern about Sizewell C. My concerns can be summarised as follows: 1. SITE SELECTION, ENVIRONMENT & LANDSCAPE. Given climate change, sea level rises and...
Read more
-
Dear Sir/Madam REPRESENTATION BY NATIONAL GRID ELECTRICITY TRANSMISSION PLC (“NGET”) TO THE SIZEWELL C DCO (“THE PROJECT”) NGET wishes to make a relevant representation to the Project DCO in order to...
Read more
-
Introduction The National Trust (The Trust) is an independent charity that looks after beautiful countryside and historic buildings in England, Wales and Northern Ireland. Should the Trust acquire...
Read more
-
I am concerned with emergency access and egress to and from the Sizewell C site
-
I wish make a Relevant Representation to raise the following issues of concern about Sizewell C. 1. Requirement for energy production • It is unclear why a huge generation capacity is required in East...
Read more
-
Sizewell C consultation 3rd Stage Submission Date 20th March 2019 & 27th September 2020 I am completely opposed to the plan by EDFE to construct 2 new Nuclear reactors on the coast at Sizewell in...
Read more
-
This development should not go ahead unless or until Sizewell 'A' - the magnox station - has been fully removed and the land it occupies returned to its former condition.
-
I wish to raise the following issues of concern regarding Sizewell C: I believe that the site is ill equipped to deal with another nuclear power station. Furthermore, it causes damage to ecological...
Read more
-
I am confirming that I am against the plans to build Sizewell C, for several reasons. It is not appropriate to plan or to build the 'largest construction in Europe' in a small area of Outstanding...
Read more
-
East Suffolk/Suffolk Coasts and Heaths are some of the most natural and ecologically important areas in our country. We have invested time and money in building our tourism industry, attracting...
Read more
-
Impact on the environment. Pollution levels and loss of vital habitat.
-
My concern is that increased traffic in and around Wickham Market including the High Street, Bordercot Lane and Broad Road will greatly impact the lives of local people by causing: + increased traffic...
Read more
-
I wish to register my deep concern and dismay about the proposed Sizewell C development, due to the huge threat it poses to the RSPB Minsmere Nature Reserve. Minsmere is where I fell in love with...
Read more
-
In comparison with any possible benefit that such a nuclear station on the Sizewell Coast might confer on us all, the adverse damage, environmental degradation and possible risks of major catastrophe...
Read more
-
I have the following concerns about Sizewell C. 1. Site Selection • It is the wrong project in the wrong place. • Site at risk from climate change, sea level rise, flooding, and impact on coastal...
Read more
-
I am immensely concerned about the proposed Sizewell C development on the following grounds: The huge increase in road and rail traffic in a very sensitive environment; any infrastructure development...
Read more
-
Submission to Planning Inspectorate Regarding the NNB Generation Company (SZC) Limited DCO Application for Sizewell C Nuclear Power Station and Associated Works Relevant Representation of Professors...
Read more
-
• It is unthinkable that 3,400 kg of fish will be interred in the cooling system (in addition to those already caught at B build of course) which will result in spreading many dead and dying fish over...
Read more
-
I am very concerned regarding the environmental impacts of both building sizewell C and also having another nuclear reactor on our doorstep. I am concerned regarding the new infrastructure required in...
Read more
-
I wish to raise the following issues of concern about Sizewell C which I believe is too vast for the area, and has the potential to inflict lasting damage on the neighbouring communities, East Suffolk...
Read more
-
I am very concerned about about the broad geographic impact of this, the impact on the local landscape and on wildlife. The impact on local community life, especially Yoxford and Middleton. Current...
Read more
-
1. Site selection a. The site on the East Anglian coast is at severe risk from flooding due to climate change, sea level rising and more extreme weather events. b. There are 8 other energy projects in...
Read more
-
1. I do not believe that we need to build Sizewell C to ensure our future energy security - renewables can take care of that with appropriate investment in battery technology and other storage...
Read more
-
Robert Wynn & Sons is a UK based specialist shipping operator who currently owns and operates two government funded heavy lift vessels. We are keen to see the Governments "water preferred" policy for...
Read more
-
I object to the construction of Sizewell C because :- 1.The coast of East Anglia at Sizewell is the wrong location for a nuclear power station, due to the eastern side of England sinking, coupled with...
Read more
-
Lack of infrastructure Environmental damage Increased ability of renewables to replace nuclear
-
At a critical time for the health of our planet when we must do everything in our power to help and protect our precious and vital natural ecosystems, how can anyone, anywhere, justify the further...
Read more
-
Suffolk as a rural county has areas of outstanding natural beauty and rare habitat therefore species of flora and fauna. The coast is already dominated by Sidewall A and B, which will never be truly...
Read more
-
I live in a flint cottage that is in close proximity to the railway track that will be used to transport materials to the proposed construction site at Sizewell C. EDF have said that during the 'early...
Read more
-
I wish to raise the following issues concerning the selection of Sizewell for further nuclear power generation, especially a project of this size. The site is entirely inappropriate, being at risk...
Read more
-
I wish to raise the following issues of concern about Sizewell C. 1. Radioactive Legacy for future generations. • No means of eventual safe disposal remaining dangerous for hundreds of years. • The...
Read more
-
Relevant Representation of Sarah Leach to the Planning Inspectorate with regard to the Development Consent Order (DCO) submitted by EDF for the development of Sizewell C. My name is Sarah Leach...
Read more
-
I object to EDF's plans for 2 nuclear reactors at Sizewell. The site is too small and the impacts on the fragile echo system is unacceptable The proximity to the town's of Leiston and Aldeburg and the...
Read more
-
I, Simon Frampton OBJECT to this planning application until such time as the points below can fully calculated and advised nationwide to the British Public with absolute certainty. 1. Embedded Carbon...
Read more
-
This small area of the East Suffolk Coast (supposedly The Heritage Coast) is now wracked by uncertainty and insecurity arising from the potential cumulative impacts of all the energy projects of which...
Read more
-
I am concerned about the obvious damage to the environment. I know myself and other like minded people probably can't stop it being built but I can try and ensure mitigation is adequate. Having been...
Read more
-
Dear Planning Inspectorate, DCO application Sizewell C Registration as an Interested Party - Snape Parish Council The issues below have been submitted at Stage 3 and 4. It is of concern that, despite...
Read more
-
EDF’s Sizewell C DCO Relevant Representation Please note my following concerns regarding the above application on the issues of: Climate Change: The IPCC has stated that we are at a crucial point for...
Read more
-
Relevant Representation of Stephen Leach to the Planning Inspectorate with regard to the Development Consent Order (DCO) submitted by EDF for the development of Sizewell C. My name is Stephen Leach...
Read more
-
Dear Sirs, The main points/concerns Sudbourne Parish Council wish to raise are those based on their response to the Stage 4 Consultation submission. The SZC DCO proposal has not adequately addressed...
Read more
-
I have grave concerns about The effect on the environment Sea levels rising and climate change. Coastal erosion Flooding The effect of influx of people on local services. The effect on tourism on...
Read more
-
I am concerned about the impact of Sizewell C for several reasons. Primarily my concerns relate to the impact on the environment. Sizewell C claims to be carbon neutral but omits to consider the...
Read more
-
The application by EDF is incomplete or unsatisfactory (within the regulations) on a number of areas, including: - Protection of sensitive areas, including the SSSI at the proposed access road...
Read more
-
The construction of Sizewell C must not go ahead due to the following: Destruction of a very sensitive area for wildlife - mitigation plans are totally inadequate. This is in an AONB and such...
Read more
-
My family and I [Redacted] where the main control centre of the proposed build will be sited, and next door to the proposed worker's campus. We have lived here for 10 years, and in that time have...
Read more
-
1. The radioactive waste management for waste from a new-build reactor has to have been clearly solved before an application for construction can be granted. It is not enough to have a policy that...
Read more
-
The Alde and Ore Association is a charity, with some 2000 members, which aims to preserve and protect the Alde and Ore Estuary for the benefit of the public to enjoy. Summary: Concern that the long...
Read more
-
My objection relates to the long term environmental, and ecological danger posed by the building of a new nuclear facility, including unquantifiable danger to human life over a wide area. Although...
Read more
-
I wish to raise the following issues of concern about Sizewell C. I believe it is the wrong project in the wrong place, at the wrong time! The site is at risk from the effects of climate change, sea...
Read more
-
My representation is to support Sizewell C. Long time resident of Leiston, two growing teenagers seen first hand the difficulties our rural young population face and the difficulty they can have...
Read more
-
I have a number of objections to the proposal to construct another nuclear power station at Sizewell when there are safer, greener and more cost effective renewable energy solutions available to...
Read more
-
The proposed nuclear power station is a frivolous waste of taxpayers' money, and yes. it is us taxpayers who will bear the burden. The coastline is in danger of being engulfed by ocean level rise due...
Read more
-
I submit that this enormously complex application is not suitable for a digital process at a time when people have other priorities. it should be rejected or suspended. The Sizewell site is not suited...
Read more
-
The key points are: Lack of meaningful engagement The environmental impact Alternative route The case for the road? Road design Mitigation measures Funding
-
I would like to raise concerns about Sizewell C: 1. Nuclear is dangerous An accident with radioactive substances, either at the power plant or with fuel or waste convoys, carries the risk of high...
Read more
-
Sizewell C I wish to raise the following concerns about Sizewell C I live near Bury St Edmunds and visit the coast frequently .. there are many worries about a lot of different issues for those living...
Read more
-
The Alde and Ore Community Partnership is the guardian of the Estuary Plan for the estuary communities of the Alde and Ore area. The Partnership now involves the whole community, with every parish...
Read more
-
I endorse completely the representations made by the Alde and Ore Association concerning the impact of the proposed construction on coastal erosion to the south of the site. The Alde and Ore...
Read more
-
- Risks of sea level rise and erosion likely to flood and have problems - Negative impacts on important ecological sites, cultural heritage and the landscape - The site could become and island with 5...
Read more
-
My main concerns about the building of a third nuclear power plan on the sizewell site is mainly down to its environmental impact. it has been said that the plant will take over a decade to build,...
Read more
-
I live permanently in Aldeburgh. Sizewell C will be on the Suffolk Heritage Coast and in an Area of Outstanding Natural Beauty. My personal concerns are: 1. Impact on the coast- it is hard to...
Read more
-
I wish to raise the following issues. I believe the location on the fragile Suffolk coast is inappropriate. EDF’s advisers, Cefas, told the East Anglian Daily Times that it is generally only possible...
Read more
-
I wish to endorse the Relevant Representation submitted by Stop Sizewell C. I also consider the Sizewell C planning submission to be too nationally significant and be totally unsuitable for the...
Read more
-
Broadly in line with the concerns set out by the Alde and Ore Association - who I think have done excellent research on this issue, I believe that the proposed planning application for Sizewell C...
Read more
-
The proposed build of Sizewell C power station will encroach on fragile natural habitats of national and international significance. Minsmere Nature Reserve ( including Minsmere-Walberswick Special...
Read more
-
With Regard to the current proposal from EDF - Historically Sizewell may have been seen as a sensible location for a nuclear power station but times have changed and the priorities that we have for...
Read more
-
I wish to raise the following issues of concern about the proposed Sizewell C Nuclear Power Station:- 1. The Site is too small for the proposed development and is smaller than the area defined for a...
Read more
-
I am writing this on behalf of Andrew Mills who says. Whilst I am not against nuclear power as such I feel that the size of this project can only be to the detriment of this precious area. The...
Read more
-
Dear Sir Sizewell C I wish to express my views / concerns on the Sizewell C project as follows : The noise, air quality and vibration issues of the additional HGV movements on the A12 The considerable...
Read more
-
Environmentally increasing nuclear power is a disaster. Funding should be supporting renewables. Ecologically we cannot afford to ruin the Suffolk coastline. Nature reserves and sites of special...
Read more
-
I wish to raise the following issues of concern about the proposed Sizewell C development. 1. Massive impacts on the local community of Eastbridge & Theberton a. EDF’s lack of engagement with local...
Read more
-
We have just moved here ( a year ago) and love the countryside. I cannot believe they want to build Sizewell C where they want ! The A12 is such a narrow road and the thought of 1000 truck movements...
Read more
-
The proposals put forward do not acknowledge the utter chaos the the proposal will create to small country roads to the South of the District. It is essential that a traffic plan is produced that will...
Read more
-
EDF’s application is to construct two EPR reactors between 2022 - 2034 assuming no delays, at a cost of £20 billion. EDF’s documents show that it will take 6 years to offset 5.74m tonnes of CO2 from...
Read more
-
Sizewell C is not required if the life of the existing plant is extended by 20 years as by then we will be less dependent on conventional (old) power production Sizewell C represents a significant...
Read more
-
This significant project has the potential to create significant impacts across Suffolk including highway impacts, environmental impacts, impacts to employment and skills and delivery of other...
Read more
-
24th September 2020 Dear Sir/Madam, Bramfield and Thorington Parish Council present our response to the proposals regarding Sizewell C which we do not support for the following reasons, most of which...
Read more
-
Adverse impacts on biodiversity Adverse impacts on tourism related businesses Adverse Impacts of increased road traffic Increased costs of electricity Long term impacts of storage and disposal of...
Read more
-
i am concerned about the closeness of the park and ride to my house in Lower Hacheston and the impact it will have on property value , noise , light pollution and the effect it will have on my airbnb...
Read more
-
Representation by Cadent Gas Limited (Cadent) to the Sizewell C Project Development Consent Order (DCO): Cadent is a licensed gas transporter under the Gas Act 1986, with a statutory responsibility to...
Read more
-
[Redacted] 29th September 2020 Campsea Ashe Parish Council’s Relevant Representation as Interested Party regarding Development Consent Order for EDF Energy/SZC Co. Sizewell C Nuclear Power Station...
Read more
-
I wish to raise the following issues of concern about Sizewell C: 1. I believe it is the wrong time and the wrong place for such a project 2. It will irrepairably disrupt the area of SSI wildlife...
Read more
-
I have significant concerns about the EDF proposal to build Sizewell C. I am not opposed to nuclear power as a strand of UK provision but the project is flawed and potentially catastrophic for...
Read more
-
1. Site Selection I believe it is the wrong project in the wrong place and is at risk from climate change, sea level rise and flooding. It will have a devastating effect on an area of ecological...
Read more
-
Sizewell is totally unsuited for another nuclear plant. The disruption and even destruction of the very beautiful area around Minsmere is in itself sufficient reason for rhis project to be halted now....
Read more
-
The CLA represents the interests of a wide range of farms, estates rural businesses and the protection of the environmental and natural assets they own or manage We have over 800 members in Suffolk a...
Read more
-
My concerns about this propsal are The environment. Traffic. The disruption and degredation of the tourist economy of coastal Suffolk. Environment The area around Sizewell is rich in wildlife habitats...
Read more
-
I wish to register my very strong concerns about Sizewell C: 1) Siting -- totally unsuitable in size for the proposed vast development. Additionally: ANOB, Minsmere, erosion, possible flooding,...
Read more
-
Although I am not a local, I do visit each year and am devastated to hear of the proposal to build Sizewell C. This is by any measure an area of valuable botanic and bird life, and as we know, it is...
Read more
-
The traffic on main roads in the area, namely the A12 but also roads such as the A47, A11 and A14 already struggle to cope with demand. There are therefore concerns that opening Sizewell C could...
Read more
-
I wish to raise the following issues of concern about Sizewell C. Decline of Tourism As someone who runs a local tourism based business I am very scared for the future of what is currently an growing...
Read more