  • Littlehampton Heritage Group (Littlehampton Heritage Group)

    The Rampion 2 Application ignores the UK Government’s strategic environmental advice to provide visual buffers for very large turbines. That is a primary mitigation and safeguard against unacceptable... Darllen mwy

  • Maritime and Coastguard Agency (Maritime and Coastguard Agency)

    MCA will be responding to the ExA on matters concerning the safety of maritime navigation and maritime emergency response. MCA will provide comments on the Navigation Risk Assessment, Shipping &... Darllen mwy

  • Mark Renny

    DCO for application of the Rampion2 Offshore Wind Farm. Representation by Mark Renny, Director of Brookside Holiday Camp Limited, Lyminster Road, Lyminster, Littlehampton, West Sussex. BN17 7QE I am... Darllen mwy

  • Protectcoastalsussex.org (Protectcoastalsussex.org)

    Relevant to EN-1,Section 1.1.4, [REDACTED] (PCS) will offer argument and evidence that the local impacts of Rampion 2 would result in “adverse impacts from the development outweigh benefits” . It is... Darllen mwy

  • Steven Gibbs

    As a caravan owner on the site next to the planned access road for the development I wish to object to the road next to the caravan park. I bought a van on this site for the quiet, relaxed feel of the... Darllen mwy

  • Brooke S Essapen

    I am strongly opposed to the Rampion 2 Offshore Wind Farm. My main objection is the inefficiency of the location as well as the environmental impact. There are many other sites around the UK,... Darllen mwy

  • Ian West

    We live on the sea on Middleton on Sea beach. The wind farm proposed would be directly in our view. There is no need to have it so high or so close to the coast that the sea views will be impacted for... Darllen mwy

  • John Briggs

    I live on rustington foreshore and rampion 2 will significantly impact the coastline landscape due to size of structures since rampion 1 I have noticed a significant amount of chalk washing up on our... Darllen mwy

  • Nicholas Maslin

    Too close to the land, having a detrimental effect on tourism, marine leisure activities, wildlife and fishing. The land link will destroy a large area of the South Downs National Park, for decades to... Darllen mwy

  • RICHARD BAILEY

    I have attended a presentation by RWE on the Rampion 2 project and have studied their plans quite thoroughly. The key issues that were raised at the meeting by opponents were NOT properly answered by... Darllen mwy

  • Aldwick Parish Council (Aldwick Parish Council)

    The Parish Council is an interested party in terms of representing residents' views: There are concerns over the scale of the proposals and visual impacts affecting Aldwick residents, and with the... Darllen mwy

  • Francis John Rodney Brown

    The central point of this Comment is that continued protection of the South Downs National Park and the Seven Sisters Heritage Coast should be a Principal Issue in this process. The proposal has a... Darllen mwy

  • John INVERDALE

    I feel this development is contrary Government guidelines that projects on this scale should be 14 miles from shore, and am also very concerned about the effect on the South Downs National Park in... Darllen mwy

  • Lawrence Haas

    My registration comment is made in association with Protect Coastal Sussex (PCS) which is a voluntary affiliation of community organisations and residents along the south coast and project-affected... Darllen mwy

  • Patricia Donaldson

    I don’t know how a project can be passed when the plans are not detailed so you can see them. It seems to be hidden which is not right

  • Peter Fairhall

    Destruction of wildlife rich countryside. Extra traffic, noise and disruption for many years. Safety worries on such a busy main route.

  • Richard Napier Luce

    1. Dragon’s Lane: This is a private unmade up lane with six houses. Rampion propose to use it for ‘operational access’ only. We have had assurances that there is no intention of using HGVs which would... Darllen mwy

  • Derrick Chester

    I am registering to express my support for the proposal. In terms of the mitigation I note it is proposed to bring the cabling ashore at Climping Beach. It should be noted Climping Beach and its... Darllen mwy

  • Robert William Gale

    I do not support the Rampion 2 Infrastructure Project. My concerns are in the following areas - 1.Location This is clearly not the best location for a windfarm. At best the winds can be considered... Darllen mwy

  • Terence Ellis

    The Rampion 2 Application (for a wind farm in the sea off West Sussex) ignores the UK Government’s strategic environmental advice to provide visual buffers for very large turbines. That is a primary... Darllen mwy

  • Captain Roger Robinson-Brown

    The impact of these 325 m high structures will be detrimental to the Seaside Tourist Industry of West Sussex. The only way they can be justified is to comply with Government Guidelines and comply with... Darllen mwy

  • Dennis Buckingham

    • At a distance of only 8 miles from shore, the Rampion 2 site contravenes the OESEA guidelines that offshore windturbines should be at least 25 miles from a National Park ( in this instance the South... Darllen mwy

  • Ian Howard

    I am disappointed to read that rampion2 is moving forwards as it goes directly agsinst OLSEA2 government guidelines ie it is not offshore. This, coupled, with the Rampion 1 capacity of 2.25% leads me... Darllen mwy

  • Lorraine Robinson-Brown

    Whilst I support the need for cleaner energy, I must take issue with the size, scale and sighting of the Rampion 2 development. At around 8 miles It is much too close to our coastline. If these are to... Darllen mwy

  • ROBERT MARTIN WHITELAW

    I wish to object strongly to Rampion 2 Offshore Wind Farm. I am in favour of offshore wind farms and had no objection to Rampion 1, but the height of the proposed turbines just 8 miles offshore is... Darllen mwy

  • Ronald Alan Leggett

    There are already long queues of traffic travelling West into Cowfold Village every morning and evening with very many Heavy Good Vehicles. plus vehicles stopping for any more than a few minutes such... Darllen mwy

  • Sarah Patton

    The sheer scale of the scheme in environmentally sensitive inshore waters with a cleared transmission right-of-way through a National Park will disrupt and permanently degrade ecosystems in the sea,... Darllen mwy

  • Sheelah Baines

    This is one of very few unspoilt coastal areas in the south east with far reaching views. There are also many migrating birds. The enormous turbines will be extremely detrimental especially in the... Darllen mwy

  • Paul Isaacs ar ran Eileen Isaacs (Eileen Isaacs)

    We are concerned about the adverse effects the proposed plans will have on the environment and the detrimental impact on the coastline & the AONB viewed from the South Downs National Park

  • Kelly Johnson

    - The proposed site is not a suitable location - Disruption to the local area, mainly traffic lights for potentially six years on the A272 will make local day to day life very difficult indeed, for... Darllen mwy

  • Maria Tomalova

    The wind farm as a whole, will be up to 196km2,it will affect not only marine life, the views on the sea disturbed by a bright reflective fence 325m tall across the Sussex Bay. It will affect the... Darllen mwy

  • Alan John Lovell

    1. The cost of offshore wind generated electricity is excessive compared with other energy sources and we, the end users, will have to pay for it over many years to come. 2. This has all occured... Darllen mwy

  • Ancleggan Limited (Ancleggan Limited)

    Representation from Ancleggan Limited in response to a notice served on it pursuant to Section 56 of the Planning Act 2009 on behalf of Rampion 2 Offshore Windfarm (the “Rampion Development”). 1.... Darllen mwy

  • Robert MILLER

    I am concerned about the size and location of the turbines. Further out to sea would appear to yield a better efficiency compared to the current proposal.

  • Southern Water Services Limited (Southern Water Services Limited)

    Relevant Representation – Rampion 2 Offshore Windfarm Project This relevant representation is submitted on behalf of Southern Water Services Limited (“SWS”). SWS is the appointed water and sewerage... Darllen mwy

  • David Martin Coulton

    The wind farm is too close to the shore and should be moved further out to sea or to another location. This will therefore be in an area of greater wind speed.

  • Jonathan Bell

    I do not believe this wind farm will be located in the best position as there is not enough wind power to support it. It will have a detrimental effect on the wild life in the area and the turbines... Darllen mwy

  • Kristiane Kronsbein

    Importance of supporting renewable energies in the region to limit climate change

  • Simon Dudley-Warde

    The proposals for this wind farm are unacceptable and have not been consulted on fully or correctly by the applicant. The benefit of energy production in this form is still unproven without the... Darllen mwy

  • Victoria Mary Harris

    The proposed turbines are too large and too close to shore. The seascape will be destroyed the damage to the sea bed unnecessary for the kelp farm which is repairing itself. The amount of energy that... Darllen mwy

  • Wendy Robinson

    The near shore trawler ban has allowed the Sussex Kelp Forest Project to start to regenerate. Climping Beach residents are talking to research organisations to see if Climping Beach would be a good... Darllen mwy

  • Bolney Parish Council (Bolney Parish Council)

    · For the amenity of neighbouring residential properties, the construction hours permitted for both the works on the underground cable route through the Parish from the Oakendene substation to the... Darllen mwy

  • Graham Richard Diggens

    installing wind turbines only around 8km from the coast is not within Government Guide lines , being on the edge of the South Downs National Park they should be sited at a much greater distance from... Darllen mwy

  • Natalie Dittmer

    Opposition to proposed project: Failure to consult adequately with those who will be impacted by substation construction in Cowfold - no public meetings held in Cowfold during consultation. Inadequate... Darllen mwy

  • David Harvey Turner

    The huge size of the generators The proximity of the wind farm to the shoreline - why not site it further off shore? The works- we could hear the windfarm off Worthing (Rampion 1?) being built; we are... Darllen mwy

  • Heather Burles

    We cant use wind power for everything due to geographic limitations: Wind energy can only be harnessed in areas that get a lot of wind. Wind farms are most often seen on the tops of hills or offshore,... Darllen mwy

  • John Lucas

    I wish to support the expansion of clean green economically sound energy

  • Norman Swaffer

    The Main issues that I wish to raise. The Phase 2 Turbines planned are very large, and will have a huge visual impact, thus likely to affect important "visitor" income , surely they should be located... Darllen mwy

  • Penelope Hopkins

    I object to the proposals. Impact on Kent Street Cowfold: I agree with the views expressed by CowfoldvRampion, our community action group. During the informal consultation and the first round... Darllen mwy

  • Robert Wanders

    I believe that the main concern is as to how much the wind farm will impact on our views, and whether this will be detrimental to the tourism of the area, particularly between Littlehampton & Bognor... Darllen mwy

  • Tim Facer

    I am opposed to the project. The cable route will go through most of the fields on my farm. I have asked RWE on numerous occasions for copies of the surveys undertaken on my farm but have never... Darllen mwy

  • Geoffrey Hunt

    I am particularly concerned about the environmental impact of the proposed cable route that runs past Cratemans farm, through lowland water meadows and blackthorn scrub, which is rich in biodiversity.... Darllen mwy

  • Connie Davies

    I object to the proposals. Economic impact of the Substation at Oakendene I agree with the views expressed by CowfoldvRampion, our community action group, and support the evidence they will provide in... Darllen mwy

  • Matthew Davies

    I object to the proposals. Impacts on Human Health from the construction of the Oakendene substation: I agree with the views expressed by CowfoldvRampion, our community action group. The impacts on... Darllen mwy

  • Nigel Peter Ready

    Our house has a beach frontage. I am concerned at possible visual intrusion of the turbines.

  • Bognor Regis Town Council (Bognor Regis Town Council)

    The application is for an offshore wind farm with an area up to approximately 196km2 comprising up to 90 wind turbines off the coast of Bognor Regis. With the proposed development in such close... Darllen mwy

  • Roger James Hills

    Although I support wind farms, I object to Rampion 2. It is an excessive extension, in the wrong location, too close to shore, with turbines that are too large. They will compromise the seascape,... Darllen mwy

  • Faye Christensen

    Concerns about this Application are numerous. I ask the Examination Authority to suspend now, or call for the immediate suspension of the Rampion 2 Examination by the Secretary of State while the... Darllen mwy

  • Storrington & Sullington Parish Council (Storrington & Sullington Parish Council)

    Members fully support the Government's target to reduce CO2 emissions to zero and believe this should be undertaken as soon as possible. To that end, Members are also fully supportive of the... Darllen mwy

  • John Goring ar ran Wiston Parish Council (Wiston Parish Council)

    Lack of consultation. Not listening to local parish councils and communities. Not trying to minimise disruption to farmers and rural households. Not properly scoping alternative routes. Very poor... Darllen mwy

  • Maureen Booth

    • I am opposed to this project for several reasons. • It will be very visible from almost the entire Sussex coast (possibly even Kent coast) which with the height and spread will ruin a view and it... Darllen mwy

  • Gateley Hamer Limited (Gateley Hamer Limited) ar ran Stonegate Group / Unique Pub Properties Ltd (Stonegate Group / Unique Pub Properties Ltd)

    I am unable to advise at this stage as the Applicant's representative has not yet responded to my suggestion of a meeting to discuss exactly why the Applicant needs CA/TP powers over plots 27/13 and... Darllen mwy

  • Angela Broughton

    I am very concerned that the turbines will not only affect the marine and bird life, but also I feel that the turbines do not produce enough power to warrant the expense and visual impact on the... Darllen mwy

  • Twineham Parish Council (Twineham Parish Council)

    The Bolney National Grid sub station, to which the cable for Rampion 2 will be connected, lies in the Parish of Twineham. Residents of Twineham Parish have already endured the very badly run contract... Darllen mwy

  • Anna Alexandra Hawkins

    Rampion haven’t thought through and are not making public, the whole process. They state they are using Dragons Lane as an entrance for lorries. As I see it, if this is the case, a dwelling will have... Darllen mwy

  • Barbara Hughes

    I am against this wind farm as I feel the detrimental aspects of this proposal. ie energy used in building and positioning the turbines, the damage to the sea bed, interference to migrating birds,... Darllen mwy

  • Colin Rayner

    I have travelled along the A272 for work for nearly 18 years, over this time there has been a noticeable increase in traffic on the road with delays caused by traffic incidents, roadworks and... Darllen mwy

  • Jane Bannister

    A major concern is the impact on nature, in and above the sea and on land. Also the inconvenience/noise/disruption over a 4 year construction period can't begin to be appreciated

  • Langstone Harbour (Langstone Harbour)

    Langstone Harbour would like to understand more about the requirement for windfarm support vessels both during construction, commissioning and maintenance phases of the project.

  • Michael Stephens

    Traffic on A 272 and other roads, destruction of wildlife habitat,

  • Roger John Starbuck

    See the latest information regarding the actual agreed site plus where the cabling will be sighted One of 3/4 proposed Battery Farms all within a mile or so of each other Noise Traffic congestion... Darllen mwy

  • Valerie Swaffer

    I am totally against the proposal of the windfarm with power coming ashore and destroying large areas of habitat on the downs and along the route to Rampions proposed substation at Cowfold. We had no... Darllen mwy

  • Morrison Family (Morrison Family) ar ran Morrison (Morrison)

    I am writing to object to the proposal to site the proposed sub station at Oakendene A272/Kent Street and the proposed link to Bolney Sub station on Wineham Lane I think the scheme is poorly planned... Darllen mwy

  • Addleshaw Goddard (Addleshaw Goddard) ar ran Southern Gas Networks plc (Southern Gas Networks plc)

    Dear Sirs Rampion Extension Development Limited (Promoter) Application for an Order Granting Development Consent for the Rampion 2 Offshore Wind Farm Project at a location adjacent to the existing... Darllen mwy

  • Jane Lamb

    The Rampion 2 destruction of Oakendene and its route to get there.1st October 2023 To whom it may concern The Rampion 2 Substation at Oakendene. I would like to register my objection for the following... Darllen mwy

  • Janet Crosley

    I am most worried about the effect on the 3.5 trillion Insects that migrate across and back the south coast each year at a height of 150-1500mtrs, the wind turbines are 325 mtrs high. I am a retired... Darllen mwy

  • Peter Bailey

    Cowfold is already a bottleneck for traffic, particularly on the A272 to the east and west of the village. The proposed development will add considerable amounts of additional journeys by HGVs and... Darllen mwy

  • Richard Jonathan Clifford

    I am very angry that the planning process has got this far. There was no consultation and I actually heard about the project from my daughter who lives about 5 miles from here. Apart from the... Darllen mwy

  • Natasha Brabon

    The traffic in and out of cowfold is already very heavy, the introduction of traffic lights for 6 years will make getting out of our road impossible. The impact on villagers due to excess traffic will... Darllen mwy

  • Roger Alexnder Bateman

    Very concerned about disruption to the local community and businesses during the build period. Very concerned about impacts to local countryside and visual impacts of the completed site.

  • Christopher Barnett

    While I am generally in favour of renewable energy, I find that in the case of Rampion 2 there are a number of issues that have been inadequate: (1) The undemocratic consultation process. We live in... Darllen mwy

  • Christopher Irving

    I do not support this proposal . I believe Rampion have failed to inform the local community of the real consequences or effects of choosing this site, or properly considered any alternatives. My... Darllen mwy

  • John Robert Hughes

    I am very concerned that Rampion2 intend to use Kent Street as an access to their main Oakendean site and their cable workings.Kent Street is a narrow single track country lane with few usable passing... Darllen mwy

  • Deborah Baxter ar ran Baxter (Baxter)

    Local Impact - the visual impact of the windfarm which will be 2.5 times (3 storeys) the height of Rampion 1 and will be clearly visible from the South Downs National Park. The irreparable damage done... Darllen mwy

  • Oliver Huggins

    The proposed turbines are far too large and close to the shore. This will spoil the views and damage the local tourist economy.

  • Shermanbury Parish Council (Shermanbury Parish Council)

    Consultation relating to proposals relating to Cable Routes and the selection of a site for the Rampion 2 Substation Cable Routes Shermanbury Parish Council (SPC) notes that the final decision... Darllen mwy

  • Corporation of Trinity House of Deptford Strond (Corporation of Trinity House of Deptford Strond)

    Dear Sir / Madam, The Rampion 2 Offshore Wind Farm Order We refer to the above application for development consent. Trinity House is the General Lighthouse Authority for England, Wales, the Channel... Darllen mwy

  • The Eagles family (The Eagles family) ar ran Eagles (Eagles)

    We OBJECT to the proposed project mainly for the following reasons. Lack of consultation, and information Alternatives for cable route and substation - what are they? Traffic pollution, delays along... Darllen mwy

  • S Elsey

    My objections are:- CONSULTATION - I don’t believe Cowfold Residents have been consulted properly on the impact of the Rampion proposal. Laterly we have received some leaflets but we did not receive... Darllen mwy

  • Anne French

    Although I have no objection in principle to wind farms at sea, I believe, firstly, that they should be positioned further from the coast to maximise wind power, and secondly, I have concerns about... Darllen mwy

  • Derek Bradley

    I strongly support renewable energy.

  • Martin Bendall

    I’m all for it

  • Clymping Parish Council (Clymping Parish Council)

    The impact that the installation will have on Clymping Village. Rampion 2 Offshore Windfarm Submission to Planning Inspectorate Clymping Parish Council November 2023 1. Clymping is a small rural... Darllen mwy

  • K.A. Hirst

    We live very close to the sub station for the Rampion 1 off shore wind farm and cable route. We endured 6 years of a very badly run construction project. We are, therefore, anxious that the hours of... Darllen mwy

  • Philip Grocott

    I have some environmental concerns regarding Rampion 2 regarding the impact on migrating birds and also damage during the construction stage to breeding grounds for crab, lobster and other marine... Darllen mwy

  • Roger Hector Ayliffe

    Concern regarding using Long Furlong Lane as an access, this is a very narrow lane used by residents, commercial vehicles based at the Myrtlegrove Estate complex, horse riders, cyclists and walkers.I... Darllen mwy

  • Turok Family (Turok Family) ar ran Turok (Turok)

    I strongly oppose this project as it will have a profoundly negative impact on my families life the local impact on our lives will be significant I was not sent the first round of letters and maps and... Darllen mwy

  • West Sussex Local Access Forum (West Sussex Local Access Forum)

    The West Sussex Local Access Forum (WSLAF) interest is in the the treatment of public rights of way during construction work, to ensure they are kept open and available to all legitimate users as far... Darllen mwy

  • Alexandra Ball

    I am a sea side property owner and I am concerned that the proposed wind farm is too large and too close to the shore effectively ruining my visual amenity. Nowhere else in the UK are such large wind... Darllen mwy

  • Christopher Tipping

    Whilst renewable energy is supported, there needs to be meaningful engagement and consultation with affected landowners - with a willingness to address legitimate concerns.